Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net A Assembly instructions fish trap, Art - Nr. 4960-15 Attention! Only use the assembly instructions included in the scope of delivery for the assembly installation and maintenance of the respective equipment!
Please note the explanations, abbreviations and notes. If you have any questions, please contact the manufacturer. Contents Assembly instructions fish trap Art-Nr. 4960-15 ................ 1 Introduction Assembling ....................... 4 Datasheet fish trap Art-Nr. 4960-15 ....................6 Delivery contents (parts list with part numbers) ................. 8 Assembly instructions .........................
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 1 Introduction Assembling General information This equipment should be installed, inspected, maintained and operated in accordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
Page 5
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Drawings / Views All optical drawings are showing only the measurements/dimensions and are no mandatory technical views of the complete item. We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Datasheet fish trap Art-Nr. 4960-15 Equipment space: 5150 x 2700 mm safety zone: 6670 x 5100 mm equipment height: 3000 mm height of fall: 2200 mm Required safety surface:...
Page 7
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Round off foundation edges (min.R = 100 mm)! Sizes of fundations are “4-5” (natural ground). Soil class 4: soft to medium plasticity, interleave bound, with minor portion of stone (portion < 30% with bigger diameter of 63 mm grain size).
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Delivery contents (parts list with part numbers) In words Table 3-1: Delivery contents, in words Pos. Quantity Element / Size O.K. Missing Description Steel post L= 3900 mm, Ø159 mm L= 2900 mm,Ø159 mm...
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net In symbols Table 3-2: Delivery contents, in symbols Pos. Quantity Symbol L= 3900 mm, Ø 159 mm L= 2900 mm,Ø 159 mm L= ca.2500 mm L= ca.2000 mm L= ca. 2000 mm \\CAD1\Standard\4960-15\Montageanleitung\4960_15_Netz_Reuse_ST_B_L_01_GBR.doc...
Page 10
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Pos. Quantity Symbol L= ca. 1300mm Ø159 mm Ø159 mm Ø159 mm 5,5 x 25 mm Fixed anchor M12 Sidewalk slap (provided by the customer) - 10 - \\CAD1\Standard\4960-15\Montageanleitung\4960_15_Netz_Reuse_ST_B_L_01_GBR.doc...
Page 24
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Erklärungen der Abkürzungen und Zeichen: 4960-15 Netz-Reuse Steel post 3.90 m total length, Ø 159 mm Steel post 2.90 m total length, Ø 159 mm Fall protection drainage Attach radius to the foundation...
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Post installation checks If the equipment has not been installed safely, you must ensure that the public is prevented from using it. Marking filler depth • Labelling the posts to show the depth of material provided as fall protection (i.e.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Introduction Maintenance General information This equipment should be installed, inspected, maintained and operated in accordance with EN 1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more frequent inspections and/or maintenance are required if the play equipment is subject to intensive use.
Page 30
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 8.10 Faults Faults must be repaired as soon as they are detected. If serious defects that compromise safety cannot be repaired straight away, the public must be prevented from using the equipment with immediate effect.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Maintenance timetable Special advices 9.1.1 Maintenance interval We strongly advise you to carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious vandalism cause wear and tear that compromises the safety and function of the equipment.
Page 33
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 10.1 Regular maintenance (Text) m = monthly j = 1/4 quarterly j = 1/2 half-yearly ¼ j ½ j Check ground in fall and protection area for hard objects and loose foundations.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 11 Monthly maintenance 11.1 Check the spaces between the equipment and the ground (clearance and height of fall). 11.2 Check the ground surface in the area with fall protection for hard objects and loose foundations.
Zinc paint should be applied to corroded areas and scratches. The equipment must be inspected by someone with the necessary expertise in strict compliance with the instructions issued by Huck Seiltechnik GmbH. A copy of the inspection record should be given to the operator, who must confirm receipt.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 16 Hand over document After the installation of the equipment pass the installation and maintenance documents to the operator. The operator has to receive the hand over documents. The complete filled and signed hand over document should be sent to the supplier.
Need help?
Do you have a question about the 4960-15 and is the answer not in the manual?
Questions and answers