Chapter 2:
Prerequisites
Before you install the enclosure, you need to prepare your site for
installation. You must be certain that the area is level and of solid
construction. In addition, a dedicated source of electrical power should be
located near the installation site to power the enclosure, and other
apparatus. Additionally, the enclosure should be strategically placed in
the lab to provide efficient workflow.
Carefully read this chapter to learn the requirements for your installation
site:
The support, vibration and movement requirements.
The location and air current requirements.
The exhaust and blower requirements.
The electrical power requirements.
The space requirements.
Refer to Appendix B: Dimensions for complete enclosure dimensions.
Refer to Appendix C: Specifications for complete enclosure electrical and
environmental conditions, specifications and requirements.
4
Product Service 1-800-522-7658
Need help?
Do you have a question about the Protector 3930000 and is the answer not in the manual?
Questions and answers