9 - MANUAL SETUP
9.1 - Limit switch learning in closing phase
1
1
9.2 - Limit switch learning in opening phase and phase lag
1
1
1
9.3 - Learning of closing phase lag
1
1
1
terminals 6 - 10 (Step-by-Step) or with the previously
Place the motors (leaves) at 45 °.
light up and then flash.
While the 5 LEDs are flashing, give a Step-by-Step
2
command. The leaf [2] must move performing a closure.
Once the mechanical stop has been reached, it must stop and
the Right LED lights up with a red steady light.
Give a second step-by-step command. The leaf [1] must
2
perform a closure. Once the mechanical stop has been reached,
Give a Step-by-Step command. The leaf [1] starts opening.
2
As soon as it reaches the point where you want to start
opening leaf [2], give a further Step-by-Step command.
2
right remain with a steady red light.
2
Give a Step-by-Step command. The leaf [2] starts closing.
2
As soon as it reaches the point where you want to start
closing leaf [1], give a further Step-by-Step command.
right remain with a steady red light.
2
2
control unit and start again from point 7.
P.18
.