Summary of Contents for Rowlinson Garden Products SS637
Page 1
8’x6’ Shiplap Single Door Shed English SS637 Assembly Instructions Before assembly • We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly.
Page 2
1. Floor Important Prepare a firm level area that is slightly larger than the floor, for the shed to sit. To protect the floor and validate the anti-rot guarantee, adequate provision must be made to ensure ground contact is avoided. The building must not be allowed to sit in pooled water during wet conditions and air must be able to circulate underneath the building.
Page 3
4. Door header Rail & Door Rebate Strip Drill pilot holes with a 3mm drill for each screw in this section. Drill Door rebate strip to be fitted to the hinge side of the door frame only. Door header rail Door rebate strip fits under the header rail.
Page 4
6. Roof Panel, Felt Battens & Purlins Important Construct 2 left-handed and 2 Right-handed roof panel assemblies 32mm Purlin inset Purlin inset 12mm from the 12mm from the end of the roof end of the roof 10mm 1186mm panel panel 30mm Purlin set flush to...
Page 5
9. Door, Pad Bolt, Turn Button & Door Weatherestrips Drill pilot holes with a 3mm drill for the door weatherstrip screws. Drill 25mm Important Overlap the door and front panel with the door weather strips but secure to the door only. 20mm 25mm 25mm...
Need help?
Do you have a question about the SS637 and is the answer not in the manual?
Questions and answers