Summary of Contents for Rowlinson Garden Products SS435
Page 1
1.2 x 1.2 (4’ x 4’) Shiplap Modular Shed English SS435 Assembly Instructions Before assembly • We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly.
Page 2
1. Floor Prepare a level area for the shed to sit. Attach the floor frames to the floor panel. Have the two outer frames flush with the long edge (1230mm) of the floor and the two middle frames equally spaced in between. Secure each frame in place by nailing through the floor panel into the frames using 4 x 30mm nails per frame. Attach four additional (Not supplied in kit) treated wooden or similar bearers of size 50 x 50 x 1175mm to the floor.
Page 3
5. Roof Insert the two roof purlins into the rebates in the apex sections. Fix in place at the ends of the purlins, using 2 x 50mm screws per purlin. Screw through the purlin into the frame of the apex panels. It is recommended to drill pilot holes with a 3mm drill for each screw.
Page 4
If the building is to sit on soil or grass it MUST be erected on pressure treated wooden 50mm x 50mm or similar bearers (These are not supplied in the kit). Rowlinson Garden Products recommend using pressure treated bearers with all buildings on any type of base.
Need help?
Do you have a question about the SS435 and is the answer not in the manual?
Questions and answers