(2) Slide down the AP as indicated by the arrow.
3.5
Bundling Cables
Caution
Bundle the cable in a visually pleasing way.
Make sure that the fibers at the connectors have natural bends or bends of large radius.
Do not bundle the cables too tightly, as this may reduce the cable service life and transmission
performance.
The steps of cable bundling are as follows:
(1) Bundle the drooping part of the cables and place the bundle as near the ports as possible.
(2) Route the cables under the AP and run them in straight line.
3.6
Checklist After Installation
Checking the AP
Verify that the external power supply meets the requirement of the AP.
Verify that the AP is securely fastened.
Checking the Cable Connection
Verify that the cable type matches the port type.
Verify that the cables are properly bundled.
Checking the Power Supply
Verify that the power cord is properly connected and meets safety requirements.
Verify that the AP works properly when powered by the power supply.