Download Print this page

Ruijie RG-RAP73Pro Installation Manual page 19

Hide thumbs Also See for RG-RAP73Pro:

Advertisement

Installation Guide
3
Installing the AP
The RG-RAP73Pro must be installed indoors, and used in a fixed place.
Caution
Before installing the AP, make sure that you have carefully read the requirements described in Chapter 2.
3.1
Before You Begin
Before installing the RG-RAP73Pro, carefully plan and arrange the installation location, networking mode, power
supply, and cabling. Confirm the following requirements before installation:
The installation site should provide sufficient space for heat dissipation.
The installation site meets the temperature and humidity requirements of the AP.
The power supply and required current are available in the installation site.
The selected power supply modules meet the system power requirements.
The installation site meets the cabling requirements of the AP.
The installation site meets the site requirements of the AP.
The customized AP meets the client-specific requirements.
3.2
Safety Precautions During Installation
To ensure the normal operation and prolonged service life of the AP, observe the following safety precautions:
Do not power on the AP during installation.
Place the AP in a well-ventilated environment.
Do not expose the AP to high temperature.
Keep the AP away from high-voltage power cables.
Install the AP indoors.
Do not expose the AP to a thunderstorm or strong electric field.
Keep the AP clean and dust-free.
Cut off the power supply before cleaning the AP.
Do not wipe the AP with a damp cloth.
Do not wash the AP with liquid.
Do not open the enclosure when the AP is working.
Secure the AP properly.
12
Installing the AP

Advertisement

loading
Need help?

Need help?

Do you have a question about the RG-RAP73Pro and is the answer not in the manual?

Questions and answers