Download Print this page

DynaGen ES52 Installation Manual

One link v3/v3b

Advertisement

Quick Links

Installation Instructions:
1. Put the generator in stop mode.
2. Disconnect the positive battery terminal.
(Do not reconnect the positive battery
terminal until step 20.)
3. Using the magnetic mounts, mount the
One Link inside of the generator enclosure
close to the controller. (Be sure the
mounting location is away from weather
exposure.)
4. Connect the ring connector on the
wire of the battery wiring harness to the
positive (+) battery terminal.
5. Connect the ring connector on the
wire of the battery wiring harness to the
negative (-) battery terminal.
6. Route the
brown
the One Link I/O cable to the battery wiring
harness installed in steps 4 and 5.
7. Using one of the included lever wire
connectors, connect the bare
from the battery wiring harness to the
wire from the One Link I/O cable.
8. Using one of the included lever wire
connectors, connect the bare
the battery wiring harness to the
from the One Link I/O cable.
wire and
blue
wire from
black
red
wire from
brown
1 (888) 366-7886
red
black
wire
blue
wire
Dynagen ES52
Installation Guide
One Link v3/v3b
Panel:
Parts List:
OLM003B
OLSC005

Advertisement

loading
Need help?

Need help?

Do you have a question about the ES52 and is the answer not in the manual?

Questions and answers

Summary of Contents for DynaGen ES52

  • Page 1 Dynagen ES52 Installation Guide One Link v3/v3b Panel: Installation Instructions: 1. Put the generator in stop mode. 2. Disconnect the positive battery terminal. (Do not reconnect the positive battery terminal until step 20.) 3. Using the magnetic mounts, mount the One Link inside of the generator enclosure close to the controller.
  • Page 2 Dynagen ES52 Installation Guide One Link v3/v3b Installation Instructions(cont.) 9. Route the brown wire with white stripe from the One Link I/O cable to the back of the Hertz Meter. 10. Route the wire with white stripe from the One Link I/O cable to the back of the Lever Connectors(2) Hertz Meter.
  • Page 3 Dynagen ES52 Installation Guide One Link v3/v3b Installation Instructions(cont.) 19. Plug the 15 pin connector into the bottom of the One Link, and tighten both screws using a flathead screwdriver. 20. Reconnect the positive battery terminal to the battery. At this time the One Link will power up and begin communicating with the generator.