Download Print this page

Replacing The Ballast - activTek INDUCT 2000+ OZONE Manual

Duct mounted surface & air purification system

Advertisement

REPLACING THE ACTIVTEK
ASSEMBLY (CONTINUED)
9. Secure unit with (4)
thumb nuts.
NOTE: Always follow OSHA electrical lockout safety requirements to prevent accidental release of energy
during service or maintenance activities.
Visit lamprecycle.org for proper bulb disposal regulations

REPLACING THE BALLAST

WARNING
Power Cord
1 Disconnect (unplug) power cord from unit.
10
• Never attempt to check operation of the activTek
observation; severe eye damage can result; use the indicator lamps on the
bottom of the ballast only
• Disconnect power at the breaker or fuse panel before servicing unit; always
follow OSHA lockout procedures to prevent accidental exposure to electrical
energy; release of energy during service or maintenance activities
CELL
®
Power Cord
10. Reconnect power supply.
®
2 Open the cover of the unit by removing
the four (4) thumb screws then remove
the cover.
Cell Assembly by direct

Advertisement

loading
Need help?

Need help?

Do you have a question about the INDUCT 2000+ OZONE and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Induct 750+ ozoneA1022cA1023cUs40659Us40532