activTek INDUCT 2000LV Owner's Manual

activTek INDUCT 2000LV Owner's Manual

Electronic air purification system
Table of Contents

Advertisement

Available languages

Available languages

Quick Links

RESIDENTIAL HVAC AIR PURIFICATION SYSTEM
INDUCT 2000LV
activTek INDUCT 2000 LV
24 volt, Item # 00000000
ELECTRONIC AIR PURIFICATION SYSTEM
OWNER'S MANUAL
HG-LAMP CONTAINS MERCURY. Manage in
• Specifications
accordance with disposal laws: www.lamprecycle.org.
activTek Environmental, 300 East Valley Dr., Bristol, VA 24201, www.activTek.net
• Installation
• Operation
• Features
• Maintenance
PAID ENDORSEMENT
CAUTION: Read manual carefully for proper procedures and operation.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INDUCT 2000LV and is the answer not in the manual?

Questions and answers

Summary of Contents for activTek INDUCT 2000LV

  • Page 1 24 volt, Item # 00000000 ELECTRONIC AIR PURIFICATION SYSTEM OWNER’S MANUAL HG-LAMP CONTAINS MERCURY. Manage in • Specifications accordance with disposal laws: www.lamprecycle.org. activTek Environmental, 300 East Valley Dr., Bristol, VA 24201, www.activTek.net • Installation • Operation • Features • Maintenance PAID ENDORSEMENT...
  • Page 2: Table Of Contents

    Changing the Ballast ....14 INSTALLATION HARDWARE (SUPPLIED) activTek Environmental, 300 East Valley Dr., Bristol, VA 24201, www.activTek.net Phone _________________________________ This owner’s manual is also available online at: http://www.activTek.net.
  • Page 3: Installation Requirements

    INSTALLATION REQUIREMENTS ALTERNATIVE CUTTING METHOD Installation Requirements Min. 9” x 9” WARNING! - This unit must be installed by a licensed HVAC Metal Ductwork Min. 10” x 10” contractor. Failure to do so will void warranty of the product. Fiberglass 1.
  • Page 4: Fiberglass Ductwork Installation

    FIBERGLASS DUCTWORK INSTALLATION 1. Locate suitable area 2. Mark location for 3.5” opening using either the of duct for installation. mounting plate or included template. Also mark the locations of 4 screw holes in corners (see template). 3. Cut hole in duct using 3.5” hole saw. 4.
  • Page 5 MARK FOR FIBERGLASS DUCT INSTALLATION MARK IF USING ALTERNATIVE CUTTING METHOD MARK CENTER FOR 3.5” HOLE SAW MARK IF USING ALTERNATIVE CUTTING METHOD MARK FOR FIBERGLASS DUCT INSTALLATION...
  • Page 6 FIBERGLASS DUCTWORK INSTALLATION (CONTINUED) Stud 5. Remove backing from mounting plate 6. Insert (4) 2” Threaded bolts into screw holes at adhesive gasket. corners of mounting plate. Attach (4) toggle bolt anchors to ends of threaded bolts. 7. Insert (4) toggle bolts into 3/8” holes in duct. Be 8.
  • Page 7: Maintenance/Uv Lamp Indicator

    CHANGING THE ACTIVEPURE® CELL MAINTENANCE/UV LAMP INDICATOR Your InDuct 2000 LV by activTek unit requires no CAUTION: Disconnect power at the breaker or fuse panel before servicing unit. Always periodic maintenance beyond normal replacement follow OSHA lockout procedures to prevent accidental exposure to electrical energy.
  • Page 8 R E P L A C I N G T H E B A L L A S T R E P L A C I N G T H E B A L L A S T ( co nt i n u e d ) CAUTION: Disconnect power at the breaker or fuse panel before servicing unit.
  • Page 9 SYSTÈME ÉLECTRONIQUE DE PURIFICATION DE L'AIR GUIDE D'UTILISATION HG-LAMP CONTAINS MERCURY. Manage in • Caractéristiques accordance with disposal laws: www.lamprecycle.org. activTek Environmental, 300 East Valley Dr., Bristol, VA 24201, www.activTek.net • Installation DBG Group Investments, LLC • Fonctionnement dba activTek Environmental •...
  • Page 10 Caractéristiques ......2 pour l'achat de votre système d'amélioration de Cordon Plaque de À propos de Induct 2000 LV d'activTek ..2 la purification d’air activTek InDuct 2000 LV. Cette d'alimentation montage Contenu du produit .
  • Page 11: Conditions D'installation

    CONDITIONS D'INSTALLATION MÉTHODE DE DÉCOUPE ALTERNATIVE Conditions d'installation Conduits en métal AVERTISSEMENT ! - Cette unité doit être installée par de 9" x 9" min. un technicien CVC certifié. Le non-respect de ces Conduits en fibre de verre de 10" x avertissements annule la garantie de ce produit.
  • Page 12: Installation Des Conduits En Fibre De Verre

    INSTALLATION DES CONDUITS EN FIBRE DE VERRE 2. Marquez l'emplacement d'une ouverture de 3,5" 1. Repérez une zone qui convienne à à l'aide de la plaque de montage ou du modèle l'installation d'un conduit. inclus. Marquez également les emplacements des 4 trous de vis dans les coins (voir modèle).
  • Page 13 MARK FOR FIBERGLASS DUCT INSTALLATION MARK IF USING ALTERNATIVE CUTTING METHOD MARK CENTER FOR 3.5” HOLE SAW MARK IF USING ALTERNATIVE CUTTING METHOD MARK FOR FIBERGLASS DUCT INSTALLATION...
  • Page 14 INSTALLATION DES CONDUITS EN FIBRE DE VERRE (SUITE) Clou 5. Retirez le support du joint adhésif de la plaque 6. Insérez (4) boulons filetés de 2" dans les trous de vis de montage. aux coins de la plaque de montage. Fixez (4) boulons d'ancrage à...
  • Page 15: D'entretien

    CHANGER LA CELLULE ACTIVEPURE® TÉMOIN LUMINEUX UV/TÉMOIN LUMINEUX D'ENTRETIEN Votre unité InDuct 2000 LV d'activTek ne nécessite aucun ATTENTION : Mettez le disjoncteur ou le panneau de fusibles hors tension avant de entretien régulier en dehors du remplacement annuel normal procéder à la révision de l'unité. Respectez toujours les procédures de verrouillage OSHA de la cellule ActivePure®.
  • Page 16 REMPLACEMENT DU BALLAST REMPLACEMENT DU BALLAST (suite) ATTENTION : Mettez le disjoncteur ou le panneau de fusibles hors tension avant de procéder à la révision de l'unité. Respectez toujours les procédures de verrouillage OSHA afin de prévenir toute exposition accidentelle à l'énergie électrique. AVERTISSEMENT ! - Témoin UV actif.
  • Page 17 Cet équipement a été testé et déclaré conforme Nom : DBG Group Investments, LLC aux normes concernant les équipements dba activTek Environmental industriels, scientifiques, et médicaux (ISM), conformément à la section 18 du règlement de la Modèle : Induct 2000 LV (A1013B) FCC.

Table of Contents