Advertisement

Quick Links

www.ti.com
EVM User's Guide: DRV3901-Q1
DRV3901-Q1EVM User's Guide
This document is the user's manual for the DRV3901-Q1 evaluation module (EVM) and the GUI to control the
EVM. The DRV3901 is a fully integrated device for driving a pyro-fuse initiator in a 12V automotive system. The
EVM showcases two DRV3901-Q1 devices for flexibility in testing parallel or redundant systems. The device
supports an input voltage up to 28V and runs on a logic supply voltage of 5.0V.
1
Introduction.............................................................................................................................................................................2
2 Hardware Overview................................................................................................................................................................
Points...............................................................................................................................................................4
Indicators....................................................................................................................................................................5
3 EVM GUI Control Application................................................................................................................................................
3.1 MSP430 FET Drivers.........................................................................................................................................................
3.2 Cloud-based GUI...............................................................................................................................................................
3.3 Local Installation................................................................................................................................................................
Operation.................................................................................................................................................................9
4.1 Hardware Set-up................................................................................................................................................................
4.2 Launching the DRV3901-Q1EVM GUI Application............................................................................................................
Overview.........................................................................................................................................................................11
EVM.....................................................................................................................................................13
5.3 Scripting Window.............................................................................................................................................................
6 Pyro Fuse SPI Modes...........................................................................................................................................................
6.1 Stand-alone SPI...............................................................................................................................................................
6.2 Addressable SPI..............................................................................................................................................................
7 Revision History...................................................................................................................................................................
Trademarks
All trademarks are the property of their respective owners.
SLVUCN2A - OCTOBER 2023 - REVISED AUGUST 2024
Submit Document Feedback
ABSTRACT

Table of Contents

Headers.............................................................................................................................4
Configurations...................................................................................................................13
Copyright © 2024 Texas Instruments Incorporated
Table of Contents
DRV3901-Q1EVM User's Guide
3
7
7
8
8
9
9
14
16
16
16
17
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DRV3901-Q1EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DRV3901-Q1EVM

  • Page 1: Table Of Contents

    3 EVM GUI Control Application..............................3.1 MSP430 FET Drivers................................. 3.2 Cloud-based GUI................................3.3 Local Installation................................4 EVM GUI Operation.................................9 4.1 Hardware Set-up................................4.2 Launching the DRV3901-Q1EVM GUI Application......................5 GUI Overview..................................11 5.1 Programming the EVM..............................13 5.2 Saving and Loading Register Configurations........................13 5.3 Scripting Window................................
  • Page 2: Introduction

    The DRV3901-Q1 has multiple-diagnostic and protection features (over-current protection, over-temperature shutdown, under voltage, and more) that protect the IC and check the availability of the deployment function. DRV3901-Q1EVM User's Guide SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 3: Hardware Overview

    Both Figure 2-1 Table 2-1 are referenced in the following sections. Figure 2-1. DRV3901-Q1EVM Hardware Components Table 2-1. DRV3901-Q1EVM Detailed Description of Components Component Description J3: NAD_nFAULT resistor for Driver A J8: NAD_nFAULT resistor for Driver B STATUS LEDs. Refer to Table 2-4 J1: S1 button function selection header.
  • Page 4: Connectors And Configuration Headers

    Hardware Overview www.ti.com Table 2-1. DRV3901-Q1EVM Detailed Description of Components (continued) Component Description J7: Header for serial communication signals (RX, TX) and TDIO or TCK for programming main MCU (U5). Shunts are required for communication between main MCU (U5) and ezFET-LITE debugger.
  • Page 5: Led Indicators

    2-3 highlights all of the LEDs in the DRV3901-Q1EVM, and Table 2-4 briefly describes each LED. Figure 2-3. LED Indicators SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 DRV3901-Q1EVM User's Guide Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 6 Driver B fault indicator: Turns ON when a fault is detected Driver A fault indicator: Turns ON when a fault is detected DRV3901-Q1EVM User's Guide SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 7: Evm Gui Control Application

    3 EVM GUI Control Application The GUI application is written with Texas Instruments’ GUI Composer, and can be run directly from a Chrome- based web browser, or installed onto your computer. Because GUI Composer apps are written with a NodeJS back end, the GUI application is cross-platform compatible by design.
  • Page 8: Cloud-Based Gui

    (Windows, Linux or Mac). Refer back to the previous section for a visual depiction of the Gallery page. 3. Decompress the .zip file. 4. From the decompressed archive, run the installer DRV3901-Q1EVM-GUI-x.y.z.setup-win.exe. If the GUI Composer Runtime is not installed on the PC, the installer will automatically start the process. The installer contents will look slightly different for each OS.
  • Page 9: Evm Gui Operation

    1. Launch the GUI application. 2. From the screen reference in Figure 4-1,click on the icon to the right labeled "DRV3901-Q1EVM". Figure 4-1. GUI Startup Page 3. After clicking the icon, the GUI application will initiate communications with the EVM. Connection...
  • Page 10 Register Map page for read/write access of register bit fields. • Control page with configuration and diagnostic options. • GUI Home page DRV3901-Q1EVM User's Guide SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 11: Gui Overview

    DRV3901-Q1. Figure 5-1. GUI Control Page Overview Figure 5-2. Regmap Overview SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 DRV3901-Q1EVM User's Guide Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 12 GUI Overview www.ti.com Table 5-1. DRV3901-Q1EVM GUI Description Section Description Main GUI start-up page Register map page. Device registers can be read/written to configure device. All of the configurations can be done in the register map if desired. Pyro control page. Most of the basic configurations can be done in this page.
  • Page 13: Programming The Evm

    4.1. 2. Open the GUI and click on the "DRV3901-Q1EVM" icon on the right side of the main start-up page. The GUI will attempt to connect to the EVM but may fail. Please be patient and wait until either the GUI says the EVM was not connected successfully or it was connected.
  • Page 14: Scripting Window

    Figure 5-5. Scripting Window In the scripting window user can implement different functions for register write, read or delays using javascript. DRV3901-Q1EVM User's Guide SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 15: Section Description

    Record button to record commands directly from the GUI. Once this is clicked return to the GUI and do the functionalities which will auto-generate the script and can be accessed from the scripting window. Script function. SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 DRV3901-Q1EVM User's Guide Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 16: Pyro Fuse Spi Modes

    To write to a specific driver, it has to be selected in the GUI. DRV3901-Q1EVM User's Guide SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 17: Revision History

    NOTE: Page numbers for previous revisions may differ from page numbers in the current version. Changes from Revision * (September 2023) to Revision A (September 2024) Page • Updated document for public release.........................1 SLVUCN2A – OCTOBER 2023 – REVISED AUGUST 2024 DRV3901-Q1EVM User's Guide Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 18 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 19 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 20 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 21 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 22 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 23 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2024, Texas Instruments Incorporated...

Table of Contents