Appendix
Step 3:
Connect the conductors to terminal 24 and 25 of the meter.
Setting Procedure
After connecting the meter to the inverter, set parameters for it on the inverter.
Step 1:
Select Advanced Settings > Meter/CT Settings > Meter.
Step 2: Set Meter1Addr to 1 and Meter1 Direction to Positive.
You can check the connection status in Meter/CT Check. For details, see
Meter/CT
====Meter/CTSetting====
>Select
Meter
192
MPPT2
MPPT3
Figure 15-7 Connecting inverter to meter
Check".
====Meter/CTSetting====
>Meter 1 Addr
Waterproof
distribution box
1
"Setting
====Meter/CTSetting====
>Meter 1 Direction
Positive
Need help?
Do you have a question about the X3-HYB-G4 PRO Series and is the answer not in the manual?