Installation; Package Contents; Before You Connect To The Network - D-Link DES-3550 User Manual

Managed 48-port 10/100mbps and 2ge ports layer 2 ethernet switch
Hide thumbs Also See for DES-3550:
Table of Contents

Advertisement

DES-3550 Layer 2

Installation

Package Contents

Before You Connect to the Network

Installing the Switch Without the Rack
Rack Installation
Power On
Package Contents
Open the shipping carton of the Switch and carefully unpack its contents. The carton should
contain the following items:
One DES-3550 Stand-alone Switch
One AC power cord
This Manual
Registration card
Mounting kit (two brackets and screws)
Four rubber feet with adhesive backing
RS-232 console cable
If any item is found missing or damaged, please contact your local D-Link Reseller for
replacement.
Before You Connect to the Network
The site where you install the Switch may greatly affect its performance. Please follow these
guidelines for setting up the Switch.
Install the Switch on a sturdy, level surface that can support at least 3 kg (6.6 lb) of
weight. Do not place heavy objects on the Switch.
The power outlet should be within 1.82 meters (6 feet) of the Switch.
Visually inspect the power cord and see that it is fully secured to the AC power port.
Make sure that there is proper heat dissipation from and adequate ventilation around
the Switch. Leave at least 15 cm (6 inches) of space at the front and rear of the Switch
for ventilation.
Install the Switch in a fairly cool and dry place for the acceptable temperature and
humidity operating ranges.
Install the Switch in a site free from strong electromagnetic field generators (such as
motors), vibration, dust, and direct exposure to sunlight.
Fast Ethernet Switch User's Guide
20
SECTION 2

Advertisement

Table of Contents
loading

Table of Contents