Mounting
1. Disconnect the power supply.
2. The indicator mounted on a rail in the distribution box.
3. Using a screwdriver, remove the screws and remove the front
shield meter terminals.
4. Connect the voltage-controlled phase, following the indica-
tions to terminals 1 (L1), 2 (L2), 3 (L3).
5. N-wire connect to terminal 4.
6. Transformers fasten on the phase conductors and secondary
outputs connected in accordance with the indications to the
terminals: 10-9 (L1), 8-7 (L2), 6-5 (L3).
Do not tighten the terminals without an inserted wire.
This may damage the clamping mechanism or the plastic
cover of the terminal.
7. Additional pulse receiver connected to terminals 20(+) – 21(–).
The terminals are located under the top shell meter terminals.
Additional pulse receiver is not required.
8. Pull the cap setting button transmission. Program indicator
slide the cap.
The housing has a hole for safety seal assumption.
9. Put the meter terminals covers.