Blastrac BG-250 Operating Instructions Manual
Hide thumbs Also See for BG-250:

Advertisement

Quick Links

Operating manual BG-250
BG-250
Version 1.0
info@blastrac.eu

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BG-250 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Blastrac BG-250

  • Page 1 Operating manual BG-250 BG-250 Version 1.0 info@blastrac.eu...
  • Page 2: Ec Declaration Of Conformity

    Operating manual BG-250 2/11 EC DECLARATION OF CONFORMITY in accordance with Appendix II sub A of Directive 98/37/EC BLASTRAC B.V. Utrechthaven 12 NL - 3433 PN NIEUWEGEIN Tel: 0031 (0)30 601 88 66 Fax: 0031 (0)30 601 83 33 Info@Blastrac.nl...
  • Page 3: Table Of Contents

    Operating manual BG-250 3/11 Table of contents EC Declaration of Conformity 1. Introduction 2. Machinedescription Application Accessory’s 3. Safety Safety precautions Safety regulations Safety instructions 4. Initial operation Checkpoints of electrical safety Checkpoints of machine safety Removing the diamond disc Mounting the diamond disc 5.
  • Page 4: Introduction

    The rotating parts are covered by a protection cap with a connection for a dust hose. With a suitable Blastrac dust collector you can work without causing dust. Application The BG-250 can be used on almost any floor to plane, to make ready for coatings, or to remove coatings or glue residues. Hand lever support...
  • Page 5: Safety

    Operating manual BG-250 5/11 3. Safety Before operating the machine, the personnel must be familiar with the safety instructions given in this manual. Keep this manual near to the machine, so it can always be consulted. Safety precautions The surface to be treated must be swept clean to remove stones, screws etc.
  • Page 6: Safety Instructions

    Operating manual BG-250 6/11 The following sticker is placed on the machine. Meanings of these symbols are: Ear protection is obliged Safety glasses with lateral protection are obliged CE-mark on this machine Safety shoes obliged Consult the manual before operating the machine Personnel must tie back long hair and not wear loose clothing or jewellery including rings.
  • Page 7: Initial Operation

    Operating manual BG-250 7/11 4. Initial operation Before using the machine it is committed to inspect the machine. It is not permitted to use the machine if the machine safety is not according the checkpoints below. Checkpoints for electrical safety Use only extension cables for extending the main cable that are sized and marked in accordance with the overall power consumption of the machine.
  • Page 8: Operating

    Operating manual BG-250 8/11 5. Operating During operating the BG-250, the following additional safety instructions must be followed closely. Switch on the machine Turn on the dust collector before switching on the machine. Connect the dust hose with the machine Stand behind the machine Make sure that the machine stands on the support.
  • Page 9: Maintenance

    Store the cleaned and dry machine in a dry and humid free room. Protect the electrical motor from moisture, heat, dust and shocks. All repair work must to be done by qualified Blastrac personnel, this to guarantee a safe and reliable machine.
  • Page 10: Technical Data

    1020 mm Weight 105 kg Noise level 78dB(A) Dust hose connection 75 mm Ø Suitable filter unit Contact Blastrac BV We will assist you with a good advice Design and specifications are subject to change without notice by Blastrac BV info@blastrac.eu...
  • Page 11 Operating manual BG-250 11/11 HEADQUARTER Blastrac BV The Netherlands Utrechthaven 12 NL - 3433 PN Nieuwegein Tel: 0031 (0)30 601 88 66 Fax: 0031 (0)30 601 83 33 info@blastrac.nl Blastrac United Kingdom Unit 2, Outgang Lane, Dinnington Sheffield, South Yorkshire GB –...

Table of Contents