Outdoor Unit - Haier 3HUM18HB03/R2 - annexe 1 Installation Manual

Room air conditioner
Hide thumbs Also See for 3HUM18HB03/R2 - annexe 1:
Table of Contents

Advertisement

Available languages

Available languages

Indoor unit A
Indoor unit C
Indoor unit B
Power cable:
3G2.5mm
HSM07HEK03/R2(DB)
3HUM18HB03/R2(DB)
HSM09HEK03/R2(DB)
HSM12HEK03/R2(DB)
HSM07HEA03/R2(DB)
3HUM20HA03/R2(DB)
HSM09HEA03/R2(DB)
HSM12HEA03/R2(DB)
HSM07HRA03/R2(DB)
HSM09HRA03/R2(DB)
3HUM20HA03/R2(DB)
HSM12HRA03/R2(DB)
Indoor unit A
Indoor unit C
Indoor unit B
3HUM20H03/R2(DB)
Power cable:
3G2.5mm
1. If the supply cord is damaged, it must be replaced by the manufacturer or its
service agent or a similar qualified person. The type of connecting wire is
H05RN-F or H07RN-F.
2. If the fuse on PC board is broken please change it with the type of
T.3.15A/250VAC (Indoor), T.25A/250VAC (Outdoor).
3. The wiring method should be in line with the local wiring standard.
4. After installation, the power plug should be easily reached.
5. A breaker should be incorporated into fixed wiring. The breaker should be
all-pole switch and the distance between its two contacts should be not less
than 3mm.

Outdoor unit

1
2
Spanner
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length of each indoor unit is 5m. If total pipe length is over
30m, the function of the unit will be affected, charge more refrigerant is needed,
according to 20 g/m. But the charge of refrigerant must be conducted by profes-
sional air conditioner engineer. Before adding additional refrigerant, perform air
purging from the refrigerant pipes and indoor unit using a vacuum pump,then
charge additional refrigerant.
CAUTION
Outdoor unit
Outdoor unit
3
4
5
1.
Detach the service port's cap of
Outdoor unit
valve and 3-way's(G).Connect the service port into the projection of charge hose
(Iow) for gaugemanifold.Then connect the projection of charge hose (center) for
gaugemanifold into vacuum pump.
2.
Open the handle at Iow in
moves of gause (Iow) reach vacuum condition in a moment, check 1. again.
3.
Vacuumize for over 15min.And check the level gauge which should read -0.1MPa
(76 cm Hg) at Iow pressure side. After the completion of vacuumizing, close the
handle 'Lo' in gaugemanifold and stop the operation of the vacuum pump. Check
condition of the scale and hold it for 1-2min. If the scale-moves back in spite of
tightening, make flaring work again, the return to the beginning of 3 .
4.
Open the valve rod for the 3-way(L) valve to an angle of
After 6 seconds, close the 3-way(L) valve and make the inspection of gas leakage.
Installation of Outdoor Unit
Drawing for the installation of indoor and outdoor units
Install according to
Connection of pipes
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
and the bending radius should be 30 to 40 mm or longer.
Connecting the pipe of gas side first makes working easier.
The connection pipe is specialized for R410A.
Forced fastening without careful centering may
Half union
Flare nut
damage the threads and cause a leakage of gas.
Pipe Diameter(ǿ)
Liquid side6.35mm(1/4")
Liquid/Gas side9.52mm(3/8")
Gas side 12.7mm(1/2")
Torque wrench
Gas side 15.88mm(5/8")
Indoor unit
Outdoor unit
B1
B2
Indoor unit
In case the elevation A is more than 5m,
B3
oil trap shoud be installed every 5~7m.
Indoor unit
Max. Length: B1 max =20m
The height difference between any two units
(including indoor unit and outdoor unit) can
not be more than 15 metres.
Connection
Use the same method on indoor unit. Loosen the screws on
insert the plugs fully into terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor
unit.
If wiring is not correct, proper operation can not be carried out and controller
may be damaged.
Fix the cable with a clamp.
Attaching Drain-Elbow
If the drain-elbow is used,
please attach it as figure. (Note:
Only for heat pump unit.)
Purging Method:To use vacuum pump
3-way(G) valve, the valve rod's cap for 3-way(L)
gaugemanifold, operate vacuum pump. If the scale-
Fastening torque
18N.m
42 N.m
55N.m
60 N.m
Oil trap
B
Indoor unit
A
B2 max =20m
B3 max =20m
(B1+B2+B3) max =45m
terminal block and
anticlockwise 90 degrees.
3