Step 3 - Installation Of The Outdoor Unit - Haier GE ASH124UCDDA Installation Instructions Manual

Ductless single zone with highwall indoor unit
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Step 3 - Installation of the Outdoor Unit

A. Prepare the Outdoor Unit for Installation
• Remove all packaging.
• Place supplied vibration pads onto outdoor unit's feet.
• Use team lift to place the unit on a solid foundation, 8" above the highest snowfall.
Correct
Installation
Incorrect
Installation
Drainage
Stand top is
covered
31-5000788 Rev. 0
Drainage
Drainage
clearance is too
small, causing
inadequate
drainage.
Correct
Installation
Minimum height(H) should be higher than the highest
snowfall depth(D)(H=D+8")
Incorrect
Installation
Unit may become covered in snow if the stand height is
insufficient.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge ash3036ucddaGe ash4248ucdda

Table of Contents