idi Protego Installation Manual

idi Protego Installation Manual

Radiation shielding system

Advertisement

Protego
Radiation Shielding System
Installation Guide
The text of this manual was originally written, approved, and published by the manufacturer in English.
The information and images in this document are proprietary to IDI and are only for use for and by IDI
representatives or their Agents.
Made in the USA
L800-0140 REV D

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Protego and is the answer not in the manual?

Questions and answers

Summary of Contents for idi Protego

  • Page 1 The text of this manual was originally written, approved, and published by the manufacturer in English. The information and images in this document are proprietary to IDI and are only for use for and by IDI representatives or their Agents.
  • Page 2: Table Of Contents

    Installation Guide Protego Table of Contents Protego Product Picture - Main Assemblies Installation ........... 1 Protego Product BOM, Main Assemblies ................1 Protego Accessories & Disposables ..................1 Other Protego features ......................2 Site Installation Instructions....................2 Instructions for Operation & Usage .................. 11 General Cleaning .........................
  • Page 3: Protego Product Picture - Main Assemblies Installation

    3.2. Item 13: X800-0251 – Shield Pad, Femoral, Pb 0.25mm (12” x 17”), Box 15 pouches – 2 Boxes provided. 3.3. (Not Shown) A800-0310 – Protego Pro Kit, Box 25 pouches – 2 Boxes provided. 3.4. Other Accessories and Disposables may be added or changed for future use and improvements.
  • Page 4: Other Protego Features

    Site Installation Instructions 5.1. Crate Unpacking performed by crate shipping company staff. 5.1.1. The boxed crate(s) have been unloaded and the Protego System has been removed from crate and all components including boxes are at a designated location for Lab Room install.
  • Page 5 Arm Boards and shields and place on Mobile Barrier door hangers to move to lab. 5.2.6. Move Mobile Stand, Mobile Barrier, remaining table shields and disposables to room for Protego Setup & Operator and staff Procedure review per following documents by IDI sales representative.
  • Page 6 Installation Guide Protego 5.4. Adjusting vertical arm limit/spring force and arm brake adjusts – These settings were set at factory and should not be needed but if there is a need for additional adjustment during product use. Refer to OASYS Healthcare Instructions –...
  • Page 7 Installation Guide Protego L800-0140 REV D www.imagediagnostics.com Page 5...
  • Page 8 Installation Guide Protego 5.4.2. Load Adjustment. Refer to Figure 26 from OASYS Manual 4041013 listed below. L800-0140 REV D www.imagediagnostics.com Page 6...
  • Page 9 Installation Guide Protego 5.4.3. Parallel Adjustment. Refer to Figure 29 & 30 from OASYS Manual 4041013 L800-0140 REV D www.imagediagnostics.com Page 7...
  • Page 10 Tighten each set screw equally to a point just beyond stopping arm movement as needed, this can be at IDI Rep discretion. 5.6. Attaching Item 7, Pedestal Shield – Five Versions – Rail or Velcro attachment 5.6.1.
  • Page 11 Item 4 & 5 assemblies. For permanent installation there are five set screws, at least two must be locked into the existing table rail, see WARNING. If Protego is to be moved from room to room, then Allen wrench must be used to retract set screw(s).
  • Page 12 This will enable future placement in the same position if the system is moved. WARNING: Issue of table panning tension, pre-set at IDI. The shield radiation barrier which is attached to the magnet locks crossing patient table may add a higher-than-normal pull tension during table panning.
  • Page 13: Instructions For Operation & Usage

    7.8.2. Final top view configuration with product components attached for procedure. Instructions for Operation & Usage 6.1. For Protego instructions for proper usage with patient shielded drapes and disposable sterile products, please see L800-0170 Protego User Manual. At least two Casters must be fully Locked while system is in use or in storage.
  • Page 14: General Cleaning

    For Mobile Radiation Stand use: Use handles to move cart with the help of an assistant to avoid collision with other equipment and walls. General Cleaning 7.1. For Protego instructions for proper cleaning, please see L800-0170 Protego User Manual. L800-0140 REV D www.imagediagnostics.com Page 12...