Unpacking and Inspection

Unpacking and Inspection
Unpacking and Inspection
Have the shipping cartons been unpacked and their contents inspected?
Was there any shipping damage?
If Yes, has a claim been filed with the freight carrier?
Were all items listed on the packing list received?
If No, has Micromeritics been notified?

Instrument Space

Instrument Space
Can the lab area where the instrument and computer will be placed accommodate the
combined dimensions of the instrument, accessories, computer and printer?

Installation Configuration

Instrument Location
Will 1/8 in. (0.375 cm) copper gas supply lines (standard installation; supplied with the
instrument) be used?
Will gas supply bottles be available within 6 feet (1.83 m) of the left side of the
instrument (standard installation)?
10

Part 2. Preinstallation Checklist

TriStar II Plus Preinstallation Instructions and Checklist
303-42870-01 (Rev B) - Mar 2015
Yes
No
___
___
___
___
___
___
___
___
___
___
Yes
No
___
___
Yes
No
___
___
___
___
___
___

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TriStar II Plus and is the answer not in the manual?

Questions and answers

Table of Contents