Download Print this page

Mercia Garden Products 01DTOVRA0806SDFW-V1 General Instructions Manual

Dip treated overlap reverse apex 8x6 single door fixed window

Advertisement

Quick Links

General Instructions
01DTOVRA0806SDFW-V1
DIP TREATED OVERLAP REVERSE APEX 8X6 SINGLE DOOR FIXED WINDOW
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTOVRA0806SDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTOVRA0806SDFW-V1

  • Page 1 For assistance please contact customer care on: 01636 821215 TYPES OF BASE Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 01DTOVRA0806SDFW-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 2438mm Door Block 150x28x28mm QTY 1 Depth = 1904mm F2828-150mm Height = 2282mm Base Dimensions: Ridge Bar 2304x28x28mm QTY 1 Width = 2350mm F2828-2304mm Depth = 1753mm...
  • Page 3 Please retain product label and instructions for future reference Pre Assembly Step 2 Parts needed - No. 1 QTY 1 No. 7 QTY 1 Before assembling remove the transportation blocks from the bottom of each panel. No. 20 QTY 3 Take care removing the blocks as to not damage Place the door (No.7) within the Door Panel (No.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Parts Needed- No.3 QTY 1 Parts Needed- No.1 QTY 1 - No.4 QTY 1 - No.3 QTY 1 Place the Plain Gable (No.3) and the Place the Door Panel (No.1) and x to Plain Panel (No.4) onto the oor, the Window panel using 3x50mm screws secure at the corners using 3x50mm...
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 8 Parts Needed- No.5 QTY 2 Parts needed - No. 5 QTY 2 - No.10 QTY 4 Fix the Eaves framing (No.11) to Place the Roof Panels (No. 5) on top of the roof sheets (No.5) using the building, ensuring equal spacing 3x30mm screws per eaves frame.
  • Page 6 Please retain product label and instructions for future reference Step 10 Step 9 Parts Needed- No.12 QTY 3 Fix the building to the oor using - No.13 QTY 1 24x40mm screws, ensuring to go - No.16 QTY 4 through the panel framing and - No.18 QTY 1 into the oor - No.23 QTY 2...
  • Page 7 Please retain product label and instructions for future reference Step 11 Step 12 Parts Needed- No.17 QTY 1 Parts Needed- No.14 QTY 6 - No.25 QTY 1 Fix the cover trims (No.14) to the Cut the felt (No.17) into 2 sheets of corners and the joins of the building, 2500mm and lay onto roof as secure using 3x30mm for each cover...
  • Page 8: After Treatment

    Please retain product label and instructions for future reference Step 14 Parts Needed- No.8 QTY 1 - No.11 QTY 2 Fix the Door Beading strips (No.11) to the door panel framing, secure using 4x30mm Screws per strip. Fix the door block (No.8) onto the door framing using 2x50mm Screws It is ESSENTIAL that you apply wood treatment immediately after the building...