9
|
Hand-over to the user
9 Hand-over to the user
Installer reference guide
70
Once the test run is finished and the unit operates properly, make sure the
following is clear for the user:
▪
Make sure that the user has the printed documentation and ask him/her to keep
it for future reference. Inform the user that he can find the complete
documentation at the URL mentioned earlier in this manual.
▪
Explain the user how to properly operate the system and what to do in case of
problems.
RZAG71~140N
Sky Air Alpha-series
4P695307-1A – 2024.02