Installation; Overview: Installation; Opening The Units; About Opening The Units - Daikin RZAG71N V1B Series Installer's Reference Manual

Hide thumbs Also See for RZAG71N V1B Series:
Table of Contents

Advertisement

7
|

Installation

7 Installation

7.1 Overview: Installation

7.2 Opening the units

7.2.1 About opening the units

7.2.2 To open the outdoor unit

Installer reference guide
34
This chapter describes what you have to do and know on-site to install the system.
Typical workflow
Installation typically consists of the following stages:
Mounting the outdoor unit.
Mounting the indoor units.
Connecting the refrigerant piping.
Checking the refrigerant piping.
Charging refrigerant.
Connecting the electrical wiring.
Finishing the outdoor installation.
Finishing the indoor installation.
INFORMATION
For installation of the indoor unit (mounting the indoor unit, connecting the
refrigerant piping to the indoor unit, connecting the electrical wiring to the indoor
unit ...), see the installation manual of the indoor unit.
At certain times, you have to open the unit. Example:
When connecting the refrigerant piping
When connecting the electrical wiring
When maintaining or servicing the unit
DANGER: RISK OF ELECTROCUTION
Do NOT leave the unit unattended when the service cover is removed.
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
RZAG71~140N
Sky Air Alpha-series
4P695307-1A – 2024.02

Advertisement

Table of Contents
loading

Table of Contents