General safety precautions

2.1.7 Gas

Installer reference guide
14
NOTICE
Precautions when laying power wiring:
Do NOT connect wiring of different thicknesses to the power terminal block (slack
in the power wiring may cause abnormal heat).
When connecting wiring which is the same thickness, do as shown in the figure
above.
For wiring, use the designated power wire and connect firmly, then secure to
prevent outside pressure being exerted on the terminal board.
Use an appropriate screwdriver for tightening the terminal screws. A screwdriver
with a small head will damage the head and make proper tightening impossible.
Over-tightening the terminal screws may break them.
Install power cables at least 1  meter away from televisions or radios to prevent
interference. Depending on the radio waves, a distance of 1  meter may NOT be
sufficient.
NOTICE
ONLY applicable if the power supply is three‑phase, and the compressor has an ON/
OFF starting method.
If there exists the possibility of reversed phase after a momentary black out and the
power goes ON and OFF while the product is operating, attach a reversed phase
protection circuit locally. Running the product in reversed phase can break the
compressor and other parts.
The gas boiler is factory‑set to:
the type of gas quoted on the type identification plate or on the setting type
identification plate,
the gas pressure quoted on the type identification plate.
Operate the unit ONLY with the gas type and gas pressure indicated on these type
identification plates.
Installation and adaptation of the gas system MUST be conducted by:
personnel qualified for this work,
in compliance with valid gas installation related guidelines,
in accordance with applicable regulations of the gas supply company,
In accordance with local and national regulations.
Boilers that use natural gas MUST be connected to a governed meter.
Boilers that use liquid petroleum gas (LPG) MUST be connected to a regulator.
The size of the gas supply pipe should under no circumstance be less than 22 mm.
The meter or regulator and pipe work to the meter MUST be checked preferably by
the gas supplier. This is to ensure that the equipment works good and meets the
gas flow and pressure requirements.