NOTICE
Take the following precautions on refrigerant piping into account:
Avoid anything but the designated refrigerant to get mixed into the refrigerant
cycle (e.g. air).
Only use R32 when adding refrigerant.
Only use installation tools (e.g. manifold gauge set) that are exclusively used for
R32 installations to withstand the pressure and to prevent foreign materials (e.g.
mineral oils and moisture) from mixing into the system.
Install the piping so that the flare is NOT subjected to mechanical stress.
Do NOT leave pipes unattended at the site. If the installation is NOT done within 1
day, protect the piping as described in the following table to prevent dirt, liquid
or dust from entering the piping.
Use caution when passing copper tubes through walls (see figure below).
Unit
Outdoor unit
Indoor unit
NOTICE
Do NOT open the refrigerant stop valve before checking the refrigerant piping. When
you need to charge additional refrigerant it is recommended to open the refrigerant
stop valve after charging.
Take the following guidelines into account when connecting pipes:
Coat the flare inner surface with ether oil or ester oil when connecting a flare
nut. Tighten 3 or 4 turns by hand, before tightening firmly.
ALWAYS use 2 wrenches together when loosening a flare nut.
ALWAYS use a spanner and torque wrench together to tighten the flare nut when
connecting the piping. This to prevent nut cracking and leaks.
a
b
c
d
a Torque wrench
b Spanner
c Piping union
Installation period
>1 month
<1 month
Regardless of the period
Protection method
Pinch the pipe
Pinch or tape the pipe
RZAG71~140N
Sky Air Alpha-series