Grease The Motor; Exchanging The Hold-Down Clamps; Exchanging The Pump Hose - GARANT GMT35 Instruction Handbook Manual

Hide thumbs Also See for GMT35:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 34
GARANT GMT35 Surface finishing machine
Interval
de
Each time the water is changed
en
Monthly or when very dirty
3x a month
Every 3 months
cs
Every 6 months
da
Annually
es
Regularly
10.1.

GREASE THE MOTOR

fr
Under normal conditions no additional greasing of the motor is necessary.
10.2.

EXCHANGING THE HOLD-DOWN CLAMPS

I
hr
ü If the hold-down clamps are no longer holding down the cover on the trough.
1. Loosen the upper cap nut from the hold-down clamp.
»
Take off the hold-down clamp together with the plastic cover.
2. Insert a new hold-down clamp.
3. Use a wrench to screw the cap nut on to the hold-down clamp.
hu
4. The hold-down clamp has now been renewed.
10.3.

EXCHANGING THE PUMP HOSE

H
it
ü Disconnect the surface finishing machine from the power supply and secure it against being switched on again.
ü Drain the water from the water tank and collect it in a suitable vessel.
1. Remove the screws from the housing cover of the hose cover.
2. Remove the housing cover, undo the hose clips.
3. Remove the hose.
nl
4. Lubricate the external sleeve of the new hose with suitable lubricant.
5. Fit the new hose.
6. Position the hose clips, make sure they are correctly seated, and tighten the hose clips.
»
Installation of the hose is now complete
pl
7. Insert the housing cover.
8. Wet the screws with suitable thread locking agent.
9. Tighten the housing cover screws.
10. Fill the water tank according to the manufacturer's instructions.
11. Provide a power supply to the surface finishing machine.
ro
12. Perform an operational test.
»
The surface finishing machine is now ready for use, the maintenance work is complete.
sl
54
Maintenance work
Clean the stainless steel filter (stain-
less steel filter in the water tank).
Check the water tank and float for
correct operation and clean them.
Clean the water tank [} Page 53]
Visual inspection of the electric wiring.
Clean the pump and all parts of the
pump.
Replace the pump suction and dis-
charge hoses.
Motor unit: Check the motor, cov-
ers, seals and screw fastenings.
Check the electrical equipment.
Safety check at the installation loca-
tion.
Trough: Check the trough, PU coating,
frame, steel springs and sieve.
Water pump: Grease the contact face
between the rollers and water hose.
Performed by
Trained person
Trained person
Trained specialist for electro-technical
work
Trained specialist for mechanical work
Trained specialist for mechanical work
Trained specialist for electro-technical
work
Trained specialist for mechanical work
Trained specialist for mechanical work

Advertisement

Table of Contents
loading

This manual is also suitable for:

501300501305

Table of Contents