Commissioning

Parameters
Description
Addr
Set the addresses of the wired room controller. If
there are two wired room controllers in the system,
each wired room controller must have a different
address.
• --: only one wired room controller in the system
• A: primary wired room controller with the address
0.
• B: secondary wired room controller with the
address 1.
Init
ON: restore factory settings.
Table 82
6
Commissioning
6.1

Commissioning checklist

1
Outdoor unit and indoor units are correctly
installed.
2
Pipes are correctly
• connected,
• thermally insulated,
• and checked for tightness.
3
Electrical connection has been correctly
established.
• Power supply is in the normal range.
• Protective conductor is properly attached.
• Connection cable is securely attached to the
terminal strip.
• Optional external accessories properly
connected and DIP switch correctly set.
• WLAN-Gateway (optional accessories)
Connection is correct and established according
to the Gateway installation instructions.
4
Condensate pump and condensate pipe is properly
installed and tested.
5
All covers are fitted and secured.
7

Troubleshooting

7.1

Faults with indication

WARNING
Risk to life from electric shock!
Touching live electrical parts can cause an electric shock.
▶ Before working on electrical parts, disconnect all phases of the
power supply (fuse/circuit breaker) and lock the isolator switch to
prevent unintentional reconnection.
Fault code
Possible Cause
EC 07
Fan speed of outdoor unit outside the normal range
EC 51
Faulty parameter in the EEPROM of the outdoor unit
EC 52
Temperature sensor error at T3 (condenser coil)
EC 53
Temperature sensor error at T4 (outside temperature)
EC 54
Temperature sensor error at TP (compressor discharge pipe)
58
Table 83
6.2

Functional test of device

The system can be tested once the installation including tightness test
has been carried out and the electrical connection has been established:
▶ Connect the power supply.
▶ Switch on the indoor unit with the wired room controller.
▶ Switch on cooling mode and set the lowest temperature.
▶ Test cooling mode for 5 minutes.
▶ Switch on heating mode and set the highest temperature.
▶ Test heating mode for 5 minutes.
▶ Ensure the function of the display unit and the wired room controller.
Observe the operating instructions provided for operation of the indoor
units.
If the room temperature is less than 16 °C, the cooling mode must be
switched on manually. This manual operation is only envisaged for
testing and emergency situations.
▶ Normally always use the wired room controller.
Activate manual operation:
▶ Press the key for manual operation ( Fig. 28, [1]) one to three
times to step through the following operating modes:
– Automatic mode
– Manual cooling mode
– Off
6.3

Handover to the user

▶ When the system has been set up, hand over the installation manual
to the customer.
▶ Explain to the customer how to use the system, referring to the
operation manual.
▶ Advise the customer to carefully read the operation manual.
If a fault occurs during operation, a fault code appears in the display
(e.g. EH 02).
If a fault is present for more than 10 minutes:
▶ Briefly interrupt the power supply and switch the indoor unit back on.
If a fault persists:
▶ Call customer service and provide the fault code and details of the
appliance.
Climate 5000 L • Climate 5000i U/L – 6721841493 (2023/05)