Commissioning

Connecting the indoor unit
NOTICE
Material damage can be caused by connecting the indoor unit
incorrectly
Voltage is supplied to the indoor unit via the outdoor unit.
▶ Only connect the indoor unit to the outdoor unit.
▶ Fold up the top cover ( Fig. 19).
▶ Undo screw and remove cover of the interface panel.
▶ Remove screw and cover [1] of the terminal ( Fig. 20).
▶ Knock out an opening for the cable feed [3] on the rear of the indoor
unit and feed the communication cable through.
▶ Secure communication cable to the strain relief [2] and connect to
the terminals 1(L), 2(N), S and
▶ Note assignment of wires to the terminals.
▶ Reattach the covers.
▶ Route the cable to the outdoor unit.
Connecting the outdoor unit
▶ Undo the screw and remove the cover of the electrical connection
( Fig. 21).
▶ Secure the communication cable to the strain relief and connect to
the terminals 1(L), 2(N), S and
same as indoor unit) ( Fig. 23).
▶ Secure power cable to the strain relief and connect to the terminals L,
N and
.
▶ Reattach cover.
4
Commissioning
4.1

Commissioning checklist

1
Outdoor unit and indoor unit are correctly installed.
2
Pipes are correctly
• connected,
• thermally insulated,
• and checked for tightness.
3
Condensate pipes are functioning correctly and
have been tested.
4
Electrical connection has been correctly
established.
• Power supply is in the normal range
• Protective conductor is properly attached
• Connection cable is securely attached to the
terminal strip
5
All covers are fitted and secured.
6
The horizontal louver of the indoor unit is fitted
correctly and the actuator is engaged.
Table 9
24
.
(assignment of wires to terminals
4.2

Functional test of device

The system can be tested once the installation including tightness test
has been carried out and the electrical connection has been established:
▶ Connect the power supply.
▶ Switch on indoor unit with the remote control.
▶ Press the Mode key to set the cooling mode (').
▶ Press arrow key (/) until the lowest temperature is set.
▶ Test cooling mode for 5 minutes.
▶ Press the Mode key to set the heating mode (%).
▶ Press arrow key (.) until the highest temperature is set.
▶ Test heating mode for 5 minutes.
▶ Ensure freedom of movement of air baffle.
If the room temperature is less than 17 °C, the cooling mode must be
switched on manually. This manual operation is only envisaged for
testing and emergency situations.
▶ Otherwise, always use the remote control.
To switch on the cooling mode manually:
▶ Switch off the indoor unit.
▶ Press the key for the manual cooling mode twice with a thin object
( Fig. 24).
▶ Press the Mode key on the remote control to exit cooling mode when
it has been set manually.
4.3

Handover to the user

▶ When the system has been set up, hand over the installation manual
to the customer.
▶ Explain to the customer how to use the system, referring to the
operation manual.
▶ Advise the customer to carefully read the operation manual.