Example Of Cryo-U; Cryopump Vacuum System; Installation - Ulvac CRYO-U Series Instruction Manual

Hide thumbs Also See for CRYO-U Series:
Table of Contents

Advertisement

Installation

IG2
PiG2
IG1
MBS-C
GV1
N
2
GV2
Refrigerator Power Cable
Figure 4-1
4-2
Vacuum
Chamber
Flexible Hoses
MBS-C :MBS-C CRYO METER
* Select a thermometer according to the model of your cryopump.
PiG1
:CRYOPUMP PIRANI GAUGE
IG1
:CRYOPUMP IONIZATION GAUGE
PiG2
:VACUUM CHAMBER PIRANI GAUGE
IG2
:VACUUM CHAMBER IONIZATION GAUGE
PiG3
:ROUGHING PUMP PIRANI GAUGE
V1
:MAIN VALVE
RV1
:CRYOPUMP ROUGHING VALVE
RV2
:VACUUM CHAMBER ROUGHING VALVE
GV1 *
:PURGE GAS INTRODUCTION VALVE (if required)
GV2 *
:PURGE GAS EXHAUST VALVE (if required)
* Refer to Section 4.4 for more details.

Example of CRYO-U

ULVAC CRYOGENICS INCORPORATED
RV2
V1
PiG1
PiG3
RV1
Compressor Unit
®

Cryopump Vacuum System

Roughing pump
Input Power Cable
To Power Source
Cooling Water

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cryo-u 12hCryo-u 12hspCryo-u 12hl

Table of Contents