Figure 8-7 Power-on process of LUNA2000-2.0MWH-2HX/LUNA2000-2.0MWH-
HE2HX
● Check the equipment before power-on. For details, see the corresponding user
● Before the first power-on, check that cables are correctly connected.
● Incorrect cable connections may cause damage to the STS or the Smart PCS.
● Before the equipment is put into operation for the first time, ensure that the
Procedure
1
Issue 15 (2023-11-01)
NO TICE
manual.
Verify the cable connections between the STS and the Smart PCS for the initial
power-on. If any exception occurs during the power-on process, stop the
operation. You can proceed with the operation only after the exception has
been handled.
parameters are set correctly by professional personnel. Incorrect parameter
settings may result in noncompliance with local grid connection requirements
and affect the normal operations of the equipment.
Item
Powering on the STS (including the STS
Auxiliary Transformer)
Copyright © Huawei Technologies Co., Ltd.
8 Powering On the System
Remarks
Corresponding
to number 1,
number 2, and
number 3 in the
power-on
flowchart