LUNA2000-2.0MWH Series Smart String ESS
User Manual
Issue 10 (2023-03-30)
Updated
Updated
Updated
Issue 09 (2023-02-20)
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Issue 08 (2022-11-15)
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Issue 15 (2023-11-01)
1 Safety
Information.
4.1 Site Selection
Requirements.
4.3 Foundation
Requirements.
1 Safety
Information.
3 Transportation and
4.1 Site Selection
Requirements.
4.2 Clearance
Requirements.
5.2 Unpacking and
5.3.2 Hoisting the
ESS.
5.3.5 Securing the
ESS.
5.4.2 (Optional) Filling the Fire Cylinder with
5.4.3 Installing the Battery in the Extinguishant Control
6.5 (Optional) Connecting Single-phase AC Input Power
8.2 Installing the Solenoid
12 Emergency
Handling.
2.4
Appearance.
2.5.1 Battery
Cabin.
2.5.2 Control Unit
Cabin.
2.7.1 Battery circuit
2.8 Typical Application
6.1 Preparing
Cables.
6.2 Connecting Socket Circuit
6.5 (Optional) Connecting Single-phase AC Input Power
8.1 Installing the
PSU.
8.2 Installing the Solenoid
8.3 Power-on
Process.
8.7 Powering On the
9 Deployment and Commissioning (SmartLogger
A.2.1 Preparations and WebUI
Copyright © Huawei Technologies Co., Ltd.
Storage.
Acceptance.
Valve.
diagram.
Scenarios.
Wires.
Valve.
ESS.
Login.
About This Document
Extinguishant.
Panel.
Cables.
Cables.
WebUI).
iv