Installation 1; Check The Main - Panasonic AlCare TK-AS500 Operating Instructions Manual

Alkaline ionizer
Table of Contents

Advertisement

Installation 1

If any are missing, contact your dealer.
Items in the package
Main unit
Power cord
(length: approx. 3 m)
For installation
Installation Adaptor
(with 4 screws)
Bushing
(with gasket)
Suction cup and
mounting plate
(for fixing the main unit)
For determination of pH level
pH test liquid (with pH chart attached)
The test liquid is used to regularly measure the pH level standard.
z
The acidic water with pH level of 4.0 or below will show the same color.
Main ingredients: Ethanol/methyl red/bromothymol blue/phenolphthalein
Check the main unit and supplied accessories
Spring
Supplied Accessories
Cartridge
(Consumables)
Drain hose (With spring / length: approx. 60 cm)
Water supply hose (No spring / length: approx. 90 cm)
Outlet Pipe
Suction Disc
Hose Strap
Bypass selector
With gasket
EN13

Advertisement

Table of Contents
loading

Table of Contents