Siemens SIMATIC S7-1500 System Manual page 338

Redundant system
Hide thumbs Also See for SIMATIC S7-1500:
Table of Contents

Advertisement

Summary
The table below provides you with an overview of the relationships described above. It shows
in particular the possible values of the output parameters if execution of the instruction is not
complete after a call.
Note
The output parameters of an synchronous instruction can change on every call.
You therefore evaluate the relevant output parameters after each call of the asynchronous
instruction.
Table 10- 6
Relationship between REQ, STATUS/RET_VAL, BUSY and DONE during a "running" job.
Seq. no.
Type of call
of the
call
1
First call
2 to (n - 1) Intermediate
call
n
Last call
Use of resources
Asynchronous instructions use resources in the CPU during their execution. The resources are
limited depending on the type of CPU and instruction. The CPU can only simultaneously
process a set maximum number of asynchronous instruction jobs. The resources are available
again after a job has been processed successfully or with errors.
Example: For the RDREC instruction, an S7-1500R/H CPU can process up to 20 jobs in parallel.
If the maximum number of simultaneous jobs for an instruction is exceeded, the following
occurs if another job is started:
• The job is not executed.
• The ERROR output parameter returns a value of 1.
• The STATUS block parameter returns the error code W#16#80C3 (lack of resources).
S7-1500R/H redundant system
System Manual, 01/2024, A5E41814787-AF
REQ
STATUS/RET_VAL
1
W#16#7001
Error code (e.g. W#16#80C3
for lack of resources)
Not rele-
W#16#7002
vant
Not rele-
W#16#0000, if no errors
vant
have occurred.
Error code if errors oc-
curred.
Basics of program execution
10.5 Asynchronous instructions
BUSY
DONE
1
0
0
0
1
0
0
1
0
0
ERROR
0
1
0
0
1
337

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-1500r/h

Table of Contents