Preparing to Install
This chapter explains the following:
•
•
•
•
For Your Safety
You should be familiar with the safety procedures involved with electrical circuitry and standard practices
for installing communications equipment. For CE1300 Regulatory Compliance and Safety Information, see
Regulatory Compliance and Safety
Environmental and Power Specifications
To view environmental and power specifications for the appliance server, see
Server.
Unpacking and Preparation
For detailed information about how to install the appliance, see
Service
Information in that guide includes:
• Installation guidelines
• Rack requirements
• Equipment requirements
• Slide rail adjustment range
For Your Safety, on page 13
Environmental and Power Specifications, on page 13
Unpacking and Preparation, on page 13
Locating Serial Numbers, on page 14
Guide.
C H A P T E R
Information.
Cisco UCS C220 M6S Server Installation and
Cisco Expressway CE1300 Appliance Installation Guide (X14.3.1)
5
Cisco UCS C220 M6 SFF Rack
13
Need help?
Do you have a question about the Expressway CE1300 and is the answer not in the manual?