Install The Appliance; Task 1: Install Into A Rack; Task 2: Insert The Sfp Network Connection Modules - Cisco Expressway CE1300 Installation Manual

Table of Contents

Advertisement

Install the Appliance

This chapter explains the following:

Task 1: Install into a Rack

For details about how to install the appliance into the rack, see the
and Service

Task 2: Insert the SFP Network Connection Modules

The CE1300 ships with two 10 Gb fiber SFP modules and two 1 Gb copper SFPs.
Caution
• Only use the SFPs supplied with the appliance. (Note that SFP modules from M4-based Expressways
• Do not mix SFPs. Either insert two 10 Gb fiber SFPs or two 1 Gb copper SFPs.
The following requirements also apply to the SFPs:
• Insert them only into the designated SFP ports on the PCIe 01 card. The leftmost SFP port corresponds
• Although SFPs support auto-negotiation for speed and duplex, they only negotiate one speed—to the
Task 1: Install into a Rack, on page 15
Task 2: Insert the SFP Network Connection Modules, on page 15
Task 3: Connect and Power On, on page 16
Task 4: Verify Power Status, on page 16
Guide.
To avoid compatibility issues, the following restrictions apply to SFP modules.
should not be reused in this appliance.)
to LAN1 on the Expressway user interface.
stated speed of the SFP and full duplex. This means you must connect them to a switch port that supports
the stated speed and full duplex:
• 10 Gb full duplex for fiber SFPs
• 1 Gb full duplex for copper SFPs
C H A P T E R
Cisco UCS C220 M6S Server Installation
Cisco Expressway CE1300 Appliance Installation Guide (X14.3.1)
6
15

Advertisement

Table of Contents
loading

Table of Contents