Regeneration Flow Chart - Ulvac CRYO-U Series Instruction Manual

Cryopump
Hide thumbs Also See for CRYO-U Series:
Table of Contents

Advertisement

Regeneration
6.4

Regeneration Flow Chart

The
following
regeneration method when using the unassisted
warm-up
and
procedures described here are based on the
CRYO-U
Cryopump Vacuum System shown in Figure
®
4-1.
◇ Regeneration through unassisted warm-up
Ⅰ.Warm-up
Close the main valve (V1), then shut off the
cryopump. The unassisted warm-up starts.
Ⅱ.Discharge (desorption) of captured gas
Leave as it is until 80K shield, 80K baffle, and
15K cryopanel reach room temperature for
exhausting the gas.
Ⅲ.Pressure buildup check
Open the roughing valve (RV1) and rough pump
the cryopump to 40Pa.
Then close the roughing valve (RV1) and check
the buildup of pressure in the cryopump. If the
pressure buildup value stayed less than 6.5Pa
for five minutes, the check is completed.
If it increased 6.5Pa or more in five minutes,
repeat the rough pumping procedures to 40 Pa
and the pressure buildup check.
Ⅳ.Cool down
Open the roughing valve after the pressure
buildup check. Then rough pump the cryopump
to 40Pa.
After closing the roughing valve (RV1), start the
cryopump. When the cryopump is cooled down
to the prescribed temperature, the regeneration
process is completed
6-4
flow
chart
explains
the
assisted
warm-up.
ULVAC CRYOGENICS INCORPORATED
Start up regeneration
each
Close main valve (V1)
The
80K shield, 80K baffle,15K cryopanel
warming up to room temperature
Open roughing valve (RV1)
Rough pump cryopump to 40Pa
Close roughing valve (RV1)
Press. buildup check
Open roughing valve (RV1)
Close roughing valve (RV1)
Cool down completed
Regeneration completed
Shut off cryopump
Yes
completed
Yes
No
Pressure ≨ 40Pa
Yes
Start up cryopump
Yes
No
No
No

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cryo-u 22wb

Table of Contents