Safety; Symbol Used - PrimeVOLT PV 2KTL-S1/G2P User Manual

Single phase grid-tied pv string inverter
Hide thumbs Also See for PV 2KTL-S1/G2P:
Table of Contents

Advertisement

1 Safety

1 Safety
1
Safety
Before using the inverter, please read all instructions and cautionary markings on the unit and in the manual.
Put the instructions to a place where you can take them easily. Our inverter strictly conforms to related safety
rules in design and test. And follow the local laws and regulations during installation, operation and
maintenance. Incorrect operation may cause injury or death to the operator or a third party, and damage to
the inverter and other properties belonging to the operator or a third party.
1.1

Symbol used

Safety Symbol
5 mins
Description
Danger of high voltage and electric shock!
Only qualified personnel may perform work on the inverter.
Residual voltage exists after the inverter is powered off. It takes 5 minutes
for system to discharge to a safe voltage.
Danger of hot surface
Do not disconnect under load! (Fire danger)
Environmental Protection Use Period
Refer to the operating instructions
Product should not be disposed as household waste.
Grounding terminal
The PV inverter is compliant with TUV.
01

Advertisement

Table of Contents
loading

Table of Contents