8 Maintenance

8 Maintenance
8
Maintenance
Before maintaining and commissioning inverter and its peripheral distribution unit,
switch off all the charged terminals of the inverter and wait at least 10 minutes after
WARNING
the inverter is powered off, otherwise there will be a high voltage shock.
8.1

Routine Maintenance

Items
Check Content
Inverter output
Statistically maintain the status of electrical yield,
status
and remotely monitor its abnormal status.
PV Inverter
Check periodically and ensure that the heat sink is
cleaning
free from dust and blockage.
Check that the inverter is not damaged or deformed.
PV Inverter
Check for normal sound emitted during inverter
running status
operation.
Check and ensure that all inverter communications
are running well.
Check that all AC, DC and communication cables
PV Inverter
are securely connected;
electrical
Check that PGND cables are securely connected;
connections
Check that all cables are intact and free from aging.
Table 8.1 Maintenance checklist and interval
41
Maintenance
Maintain Content
Interval
NA
Weekly
Clean periodically
Yearly
the heat sink.
If there is any
abnormal
Monthly
phenomenon,
replace the
relevant parts.
If there is any
abnormal
Semiannually
phenomenon,
replace the cable
or re-connect it.