Shutdown Procedure

It may be necessary to shut down the inverter sometimes during the daily use. If necessary, please follow the
procedures:
Supply Main Switch
See if there's any on site
(The figure is only for reference)
AC Circuit Breaker
Switch to OFF
(The figure is only for reference)
PV Switch
Switch to OFF
Wait at least 5 minutes
Let inverter discharge to
a safe range.
Finishing
WARNING
1
2
3
4
5
Your system has been shut down
After the inverter is powered off, the heat sink generates heat and there is excess
electricity in the inverter. To avoid electric shocks and burns, powered off inverter for
at least 10 minutes before performing operations.