Startup/Shutdown Procedure

5.2.1 Startup Procedure
Check that the installation is secure and strong enough, and that the system is well grounded.
Then confirm the connections of AC, battery, PV etc. are correct. Confirm the parameters
and configurations conform to relevant requirements.
AC Frequency
Battery Voltage 42~60V
Make sure all the above aspects are right, then follow the procedure to start up the inverter:
1) Power on PV.
2) Power on the Battery.
3) Power on the AC.
4) Power on the BACKUP.
5) Connect the cell phone App via Bluetooth. Please refer to Section 7.2 for details.
6) Click the Power ON in the App for the first time. Please refer to Section 7.2 for details.
5.2.2 Shutdown Procedure
According to actual situation, if there is a must to shut-down the running system, please follow
below procedure:
1) Connect the cell phone App via Bluetooth. Please refer to Section 7.2 for details.
2) Click the Power OFF on the App. Please refer to Section 7.2 for details.
3) Power off the BACKUP.
4) Power off the AC.
5) Power off the Battery.
6) Power off the PV.
7) If you need to disconnect the inverter cables, please wait at least 10 minutes before
touching these parts of inverter.
50/60Hz
PV Voltage
Grid AC Voltage 180~270V
Single-phase ESS Inverter User Manual
90~530V