Retrofit Installations - Assa Abloy ProEdge Installation Manual

Hide thumbs Also See for ProEdge:
Table of Contents

Advertisement

PROEDGE Smart Lock
INSTALLATION MANUAL
RETROFIT INSTALLATION ON A FLAT DOOR
Demount the 2x M6 bolts, washers and spacers
From the back of the door, put the M6 bolts
through the washers and door
From the front of the door, mount the
spacers and lock
Tighten the bolts
Note: All bolts and nuts must be
tightened with a torque between
10Nm and 12Nm
| FLAT DOORS
Page - 17

Advertisement

Table of Contents
loading

Table of Contents