Verifying Post-Installation Connectivity - Aruba 318 Series Installation Manual

Hide thumbs Also See for 318 Series:
Table of Contents

Advertisement

7. Move the clip towards the gland body, passing over the grommet, until the wavy end of the clip properly fits
into the wavy end of the gland body.
Figure 8
8. Screw the sealing nut onto the gland body.
Figure 9

Verifying Post-Installation Connectivity

The integrated LEDs on the access point can be used to verify that the access point is receiving power and
initializing successfully (see
refer to the AP Software Quick Start Guide.
Aruba 318 Series Wireless Access Point
Installing the Fiber-optic Cable Gland
Completed Installation
Table 1
and
| Installation Guide
Table
2). For instructions on initial setup and software configuration,
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap-318 rwJz152a

Table of Contents