PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Page 4
Overall Dimensions: Width = 1928mm Depth = 1824mm Height = 2066mm Base Dimensions: Width =1864mm Depth = 1776mm Before assembly please make sure you have a suitable base ready to erect your building Door Opening Window MADE IN GREAT BRITAIN AI-BSCHGPD550X1720-V1 AI-FW560X460-V1 Contents:...
Page 5
Window Strip - 12x27x926mm QTY 16 Nail Bag S1227-926mm There may be extra screws present in the nail bag Window Strip - 12x27x1776mm QTY 3 30mm Screw x 160 16mm Black Screws x 8 S1227-1776mm 40mm Screw x 8 16mm Screws x 24 Strip - 12x44x1805mm QTY 2 S1244-1805mm 50mm Screw x 61...
Page 6
Step 2 IMPORTANT: Pre-drill before xing screws. Pre Assembly PLEASE SCAN HERE: Parts needed - No. 1 QTY 2 No. 2 QTY 3 Before assembling remove the transportation blocks from the bottom of each panel. No. 29 QTY 11 No. 32 QTY 2 Take care removing the blocks as to not damage the panels.
Page 7
Step 4 Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 23 QTY 16 Parts needed - No. 2 QTY 2 No. 24 QTY 3 No. 26 QTY 2 Locate two Window Sides (No.2) on top of the base frames at the corner, ensur- On the Door sides (No.1) ing there is equal spacing between the...
Page 8
Step 6 IMPORTANT: Pre-drill before xing screws. Step 8 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 2 Parts needed - No. 3 QTY 1 No. 4 QTY 1 Locate the Door Side (No.1) on top of the base frame at the front corners, between Locate the Plain Gable Top (No.4) on top of the Window Sides (No.2) ensuring there...
Page 9
Step 12 Step 10 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 16 QTY 1 Parts needed - No. 25 QTY 1 No. 27 QTY 1 Locate the Short Door strip (No. 17) No. 28 QTY 4 to the top of the door opening.
Page 11
Step 16 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 5 QTY 1 Parts needed - No. 18 QTY 1 No. 6 QTY 1 Fix the Casement stay (No. 18) to the Place the Roof panels (No.
Page 12
IMPORTANT: Pre-drill before xing screws. Step 20 Step 21 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 7 QTY 1 Parts needed - No. 35 QTY 4 No. 17 QTY 2 No. 21 QTY 1 Locate the Corner Trims (No.35) No.
Page 13
Step 23 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 15 QTY 1 Locate the Roof trim (No.15) to the top of the building and secure with 4x30mm screws as shown. 4x30mm Screws AFTER TREATMENT: 30mm score around protective Pre drill screw hole...
Page 14
Greenhouse and apex shed assembly Step 1a IMPORTANT: Pre-drill before xing screws. Parts needed - No. 10 QTY 2 (04DTSTRDAX0606HGS-V1 + 01DTSHAX0406SDFW-V1) Internal Door: No. 11 QTY 2 Overall Dimensions: Base Dimensions: Width = 1972mm Width: 1860mm Lay the Base Frames (No.10 & 11)
Page 16
IMPORTANT: Pre-drill before xing screws. Step 6a Step 4a IMPORTANT: Pre-drill before xing screws. Parts needed - No. 13 QTY 1 Parts needed - No. 2 QTY 2 Internal Door: Locate the Door Frame (No.13) Locate two Window Sides (No.2) on onto the base framing between top of the base frame and ush to the the Door Sides (No.1).
Page 17
Step 10a Step 8a IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 5 QTY 1 Parts needed - No. 14 QTY 2 No. 19 QTY 6 No. 30 QTY 1 Locate the two Door strips (No. 15) to either No.
Page 19
Step 17a Step 15a IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 5 QTY 1 Parts needed - FROM SHED CONTENTS Internal Door: No. 6 QTY 1 No. 11 QTY 2 Place the Roof panels (No. 5 & 6) on Place the greenhouse roof frames top of the door gable and the Roof (No.11) against each window panel,...
Page 20
Step 21a IMPORTANT: Pre-drill before xing screws. Step 19a IMPORTANT: Pre-drill before xing screws. Parts needed - No. 7 QTY 1 Parts needed - No. 18 QTY 1 No. 17 QTY 2 No. 21 QTY 1 Fix the Casement stay (No. 18) to the No.
Page 21
IMPORTANT: Pre-drill before xing screws. Step 22a Step 24a IMPORTANT: Pre-drill before xing screws. Parts needed - No. 35 QTY 2 Parts needed - No. 15 QTY 1 Locate Corner Trims Locate the Roof trim (No.15) to the top of (No.35) onto the two front the building and secure with 4x30mm corners of the greenhouse, as...
Page 22
AFTER TREATMENT: score around protective cover on glazing and carefully peel covering back Want to share your experience with us? Leave us a review on Feefo, TrustPilot or Google. Your reviews help other people nd and trust our business, as well as helping to play an important role in our growth and improvement!
Page 23
PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the 04DTSTRDAX0606HGS-V1 and is the answer not in the manual?
Questions and answers