Download Print this page

Mercia Garden Products 04GREEN0606SDPB-V1 General Instructions Manual

6x6 greenhouse

Advertisement

Quick Links

General Instructions
04GREEN0606SDPB-V1
6X6 GREENHOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
measuring tape.
length
head
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 04GREEN0606SDPB-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 04GREEN0606SDPB-V1

  • Page 1 TYPES OF BASE For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 04GREEN0606SDPB-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 1928mm Depth = 1824mm Height = 2066mm Base Dimensions: Width =1864mm Depth = 1776mm Before assembly please make sure you have a suitable base ready to erect your...
  • Page 3 Please retain product label and instructions for future reference Nail Bag 30mm Screw x 152 16mm Black Screws x 8 16mm Screws x 24 40mm Screw x 8 20mm Screw x 6 50mm Screw x 60 30mm Black Screw x 24 70mm Screw x 8 Strip -12x56x1576mm x4 Strip - 12x44x543mm...
  • Page 4 Please retain product label and instructions for future reference Step 1 Step 3 Lay the Base Frames down as shown in Attach the window strips (No. 33, 34, & the diagram. Ensure the base is square 35)using 30mm screws as per the and layed on level ground, x the base diagram.
  • Page 5 Please retain product label and instructions for future reference Step 4 Step 6 Fix the corners of 2 of the Window Sides Fix the Door Sides x2 (No. 1) between the (No. 2) together with 3x50mm screws as window panels using 6x50mm screws in shown in the diagram.
  • Page 6 Please retain product label and instructions for future reference Step 8 Step 10 Fix the Door Gable tops (No. 3) & Fix the shorter Door strip (No. 16) to the Plain Gable top (No. 4) to the top of the door opening with 3x30mm panels using 4x50mm screws per screws.
  • Page 7 Please retain product label and instructions for future reference Step 14 Step 12 Fix the strips (No. 29, 30, 31) onto the Lay the roof panel down (No. 6) and place window frame using 3x30mm screws per the styrene sheets (No. 27) centralised strip.
  • Page 8 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 16 Step 18 Fix the Casement stay (No. 18) to the Attach the Roof Support bar (No. 12) opening window then align the xings to the roof panels using 5x40mm onto the window panel frame.
  • Page 9 Please retain product label and instructions for future reference Step 21 Step 20 Fit the Fascia x4 (No. 9) and the nials Fix the corner trims (No.23) in position (No. 20)to the building using using 4x30mm screws 14x30mm screws as shown in the diagram.
  • Page 10 Please retain product label and instructions for future reference Step 23` It is ESSENTIAL to seal around all window framing with silicone sealant (not included) to minimize water ingress. *Please note: This image is for illustrative purpose and may di er from your product (in regards to the number of windows) however the principle is the same.
  • Page 11 P 11...
  • Page 12 P 12...