Download Print this page
Mercia Garden Products 04GREEN0406SD-V2 General Instructions Manual

Mercia Garden Products 04GREEN0406SD-V2 General Instructions Manual

Advertisement

Quick Links

General Instructions
04GREEN0406SD-V2
4X6 GREENHOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a
Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for up to 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 04GREEN0406SD-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 04GREEN0406SD-V2

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 04GREEN0406SD-V2 Please retain product label and instructions for future reference Overall Dimensions: Width = 1215mm Depth = 1887mm Height = 2066mm Base Dimensions: Width =1191mm Depth = 1862mm Before assembly please make sure you have a suitable base ready to erect your...
  • Page 3 Please retain product label and instructions for future reference Step 2 Nail Bag Fix the corners of the Sml Window Side 30mm Screw x 33 (No. 2) and the Lrg Window Side (No. 3) with 3x50mm screws as shown in the 16mm Screws x 6 40mm Screw x 8 diagram.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 Fix the Door Sides (No. 1) between the Fix the Gable tops (No. 4) & (No. 5) to the window panels using 6x50mm screws. panels using 4x50mm screws per top as shown in the diagram.
  • Page 5 Please retain product label and instructions for future reference Step 10 Step 8 Fix the Casement stay (No. 19) to the Fix the short Door strip (No. 17) to the opening window then align the xings top of the door opening with 3x30mm onto the window panel frame.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 14 Step 12 Fit the fascia’s (No. 10) and the nial’s Attach the Roof Support bar (No. 13) to (No. 21)to the building using 14x30mm the roof panels using 5x40mm screws.
  • Page 7 Please retain product label and instructions for future reference Step 16 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back Step 17 It is ESSENTIAL to seal around all window framing with silicone sealant (not included) to minimize water ingress.