Download Print this page

Mercia Garden Products 04GREEN0806SD-V6 Manual

8x6 apex greenhouse
Hide thumbs Also See for 04GREEN0806SD-V6:

Advertisement

Quick Links

x2
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 04GREEN0806SD-V6 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 04GREEN0806SD-V6

  • Page 1 2mm Drill bit...
  • Page 3 Before assembly please make sure you have a suitable base ready to erect your building Roof Door Opening MADE IN GREAT BRITAIN AI-04GREENROOF1218X1037-V1 AI-04GREENDOOR550X1720-V2 Window QTY 3 QTY 1 AI-04GREENOW560X460-V2 Overall Dimensions: Base Dimensions: QTY 1 Width = 2042mm Width = 1864mm Depth = 2460mm Depth = 2386mm Height = 2059mm...
  • Page 4 Strip -12x44x1218mm QTY 4 S1244-1218mm QTY 2 Butter y Hinges QTY 4 Window Casement Stay QTY 1 Window Glazing Bead QTY 16 PI-07-0063 PI-07-0004 PI-07-0008 Strip - 12x44x993mm QTY 8 S1244-993mm QTY 8 Strip - 12x44x543mm QTY 1 Turn Button QTY 2 Wooden Knob QTY 1 Finial QTY 2 S1244-543mm...
  • Page 5 Step 1 Step 2 IMPORTANT: Pre-drill before xing screws. Styrene Lay the base frame down as shown in the Assemble the window (No. 2 & No. 3) and door side (No. 1) panels on diagram. Ensure the base is square and laid the oor.
  • Page 6 Step 3 Step 4 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Attach the window strips (No. 37, No. 38, No. 39 & No. 40) using 3x30mm screws as Fix the corners of the Window Side (No. 2) and the Small Window Side (No. per the diagram.
  • Page 7 Step 6 Step 8 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Fix the remaining Small Window Panel Fix a strip (No. 32) over the two Small (No. 3) in place using 3x50mm screws. Window Panels (No. 3) and x in place with 4x30mm screws per strip, one either 3x50mm Screws.
  • Page 8 Step 10 IMPORTANT: Pre-drill before xing screws. Step 12 Fix the two Door strips (No. 19) to either Lay the roof (opening window) panel (No. side of the door panels with 3x30mm 6) down and place the styrene sheets screws per strip ush to the internal (No.
  • Page 9 Step 14 Step 15 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Place the window (No. 9) into the gap in Repeat step 12, 13 & 14 for the three the roof (No. 6) and secure strip (No. 41) roof panel 7’s.
  • Page 10 Step 16 Step 17 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Place the Roof panels (No. 6) & (No. 7) on Place both Roof Support Bars (No. 13 & top of each gable, making sure the roofs No.14) between the roofs ush are ush to the Plain Gable and meet at up-against each other as shown.
  • Page 11 Step 19 Step 21 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Fix the Window Casement stay (No. 22) to Fix the building to the base with 50mm the opening window then align the screws evenly spaced as shown. xings onto the window panel frame.
  • Page 12 Step 23 IMPORTANT: Pre-drill before xing screws. Fix the Fascias (No. 12) and the nials (No. 24) to the building using 14x30mm It is ESSENTIAL that you apply wood screws as shown in the diagram. treatment immediately after the building has been assembled.