Download Print this page

Mercia Garden Products 04LEAN0804-V1 General Instructions Manual

8x4 lean to greenhouse
Hide thumbs Also See for 04LEAN0804-V1:

Advertisement

Quick Links

General Instructions
Overlap
Shiplap
Cladding
Cladding
04LEAN0804-V1
8x4 Lean to Greenhouse
Please note that we don't include xings with this product due to wall construction materials varying from house to
house. If you are unsure on the xings you require then we recommend that you consult with your local builders
merchant or a knowledgeable DIY store.
Refer to the instructions pages for your speci c product code
Fixed
Opening
Windows
Windows
Please retain product label and instructions for future reference
N/A
No
Solid Sheet
Floor
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
The images used throughout the instruction manual are generic and for
illustration purposes only; they may vary dependant on your actual product. It is
strongly advised they are read and understood before attempting installation.
TIMBER
As with all natural materials, timber can be a ected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are coated with a water based high quality colorant; this only
helps to protect the product during transit and for up to 3 months against
mould. To validate your guarantee and ensure longevity of the product, it is
ESSENTIAL the building is treated with a wood preserver within the rst three
months of assembly and thereafter in accordance with the manufactures
recommendations. Care must be taken to ensure the product is placed on a
suitable base
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
T&G Floor
Solid Sheet
Roof
x2
All building's should be erected by two
adults
For ease of assembly, you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
For Assistance Please
Contact Customer Care on
01636 880514
www.merciagardenproducts.co.uk
T&G Roof
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 04LEAN0804-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 04LEAN0804-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN Refer to the instructions pages for your speci c product code...
  • Page 2 04LEAN0804-V1 Please retain product label and instructions for future reference Fixing Kit Overall Dimensions: Length = 2492m Width = 1357mm Height = 2070mm Base Dimensions: Cover strip -1262mm x2 Length = 2492mm Width = 1312mm Vertical Beading strip -1720mm x2...
  • Page 3 Please retain product label and instructions for future reference Step 1 Step 3 Remove transportation blocks Fit the mortice lock into the recess from the bottom of each panel and fix in place with the screws before beginning assembly. provided. Fit the key plate to the Each Panel should have two inside of the door panel using the blocks.
  • Page 4 Please retain product label and instructions for future reference Step 5 Step 7 Lay the panel joists down as shown in the diagram on a firm and level base, ensure base has suitable Fix the door panel using the drainage free from areas where standing water can collect (see front page on base requirements). same method shown in step 6.
  • Page 5 Please retain product label and instructions for future reference Step 9 30mm Step 11 black screw 70mm Place the opening window and screw Fix the door, rear and large side panel to window block on top of the roof the panel joists using 50mm screws, panel.
  • Page 6 4 x 30mm black screws Follow the previous steps to assemble shed unit. Follow instructions for 04LEAN0804-V1 to assemble pent greenhouse unit up against the tall side of the Pent shed. Please note that we don't include xings with this product due to wall construction materials varying from house to house.
  • Page 7: After Treatment

    Please retain product label and instructions for future reference Step 15 Pre drill holes from the shed panel top straight into the green house roof panel. Use 4x70mm screws. 70mm screw It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled.