Download Print this page

Mercia Garden Products 04OCTGH0606-V3 General Instructions Manual

Octagonal greenhouse 6x6

Advertisement

Quick Links

General Instructions
04OCTGH0606-V3
Octagonal Greenhouse 6x6
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a
Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 04OCTGH0606-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 04OCTGH0606-V3

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 04OCTGH0606-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 1800mm Depth = 1800mm Height = 2654mm Floor blocks - 709mm Shelf Support - 573mm Base Dimensions: F4444-709mm F4444-573mm Width = 1800mm Depth = 1800mm Shelf Support - 1800mm...
  • Page 3 Please retain product label and instructions for future reference Step 2 Nail Bag To x the Door (No. 3) into the Door 70mm Screw x 1 panel (No. 2). Lay the Door panel at on the ground and place the Door within the doorway.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 Roughly positioning the Panels at 45 The Shelf support (No. 12) is xed to the degrees, x the side of the Window panel framing with 2x60mm screws. panels (No.
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 10 Fix the bunk oor support (No. 11) as For the Roof assembly, construct the shown with 1x70mm screw. framing away from the building. 1x70mm screws. Use 4x50mm screws to secure the Roof Metal Plate (No.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 11 Step 13 From the outside of the building, place Place the Roof panel (No. 5) onto the the roof frame into position making sure building, and align the short edge so it is that the Roof rafters are each equally parallel to the door panel.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 18 Secure each Roof trim (No. 12) as shown Secure each Fascia (No. 10) as shown with 3x50mm screws. with 3x30mm screws. 24x50mm screws. 24x30mm screws. 30mm Pre drill screw hole 50mm...
  • Page 8: After Treatment

    Please retain product label and instructions for future reference Step 20 Place the Ring Pull Door Handle (No. 19) on the outside of the door and use 4x20mm screws to secure. It is ESSENTIAL that you apply wood treatment immediately after the building Pre drill hole rst to avoid splitting.