Mercia Garden Products 04VCGRO-V2 General Instructions Manual

Victorian growhouse

Advertisement

Quick Links

General Instructions
04VCGRO-V2
Victorian Growhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm
sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm
above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 04VCGRO-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 04VCGRO-V2

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 04VCGRO-V2 Please retain product label and instructions for future reference Overall Dimensions: Width =1778mm Depth = 861mm Height = 1944mm Framing - 27x44x1642mm QTY 3 Base Dimensions: F2744-1642mm Width = 1730mm Depth = 821mm Strip - 7x27x410mm QTY 2 Before assembly...
  • Page 3 Please retain product label and instructions for future reference Step 2 Position the Left Side Panel (No. 1) next to the Back panel (No. 2) as shown and secure with 3x40mm screws. *Do NOT secure to the base framing until the Roof is tted.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 In order for the static doors to be xed in Place the Static Door frame in postion position. Fix the Strips (No. 9) to two of and x with 60mm screws, securing from the doors as shown with 2x30mm screws the outside as shown.
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 10 Fix the ‘L’ brackets (No. 17) in postion Attach the Butter y hinges (No. 21) to the Doors (No. 4) using 4x30mm screws with 2x20mm screws per bracket. To obtain the correct postion place Shelf A per hinge as shown.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 12 Step 13 To x Shelf B (No. 7) into position, attach Fix the Static Roof (No. 5) into postion Butt hinges (No. 20) to the underside of with 4x60mm screws at the rear and the horizontal framing with 3x30mm 4x40mm at the front.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 17 Fix 2x Roof trim (No. 13) to the side of the Fix the Roof support block (No. 16) to the Roof panels with 3x30mm screws per inside of the side panel with 1x50mm Roof trim.
  • Page 8 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...

Table of Contents