Dell 5200 Service Manual page 59

Edge gateway
Hide thumbs Also See for 5200:
Table of Contents

Advertisement

Figure 98. I/O panel screw and standoff locations
8. Install the new dual-port COM cable (included). Connect to the front I/O panel with the port labeled A to COM1 and B
to COM2, use four H4 standoffs to secure the ports to the front panel, then connect the other end of the cable to the
motherboard header.
Figure 99. Connect new COM ports to I/O panel
Installation procedure for 2x GbE LAN uFM module
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Egw-5200

Table of Contents