Advertisement

Quick Links

Installation
Manual
BKH 5.0 flat
50-98
green
©2023

Advertisement

Table of Contents
loading

Summary of Contents for Brunner BKH 5.0 flat 50-98 green

  • Page 1 Installation Manual BKH 5.0 flat 50-98 green ©2023...
  • Page 2: Table Of Contents

    10.2 Mounting frame or door frame (BKH - side with tilting door)............79 Conversions, settings....................85 11.1 Modification - lifting door: “non self closing”................85 Disposal........................88 Technical data......................90 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 3: Basic Informations

    Please notify your supplier of any damage which might have occurred during transport. Please keep these instructions. Please also take note of the online product documentation provided General instructions of the Brunner products installation for the stove construction. (https://www.brunner.de/produktdownloads/kacheloefen-kamine/allge- meine-hinweise-fuer-den-aufbau_de.pdf) laden können.
  • Page 4: Specified Symbols

    There is a certain risk, which can lead to a malfunction or damage of the related system and all devices connected with it, if the indicated notifications are not followed. NOTE Additional helpful information Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 5: Delivery Contents Bkh 50-98 Flat

    DELIVERY CONTENTS BKH 50-98 FLAT BKH 50-98 flat with lifting door © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 6 Supply air connection box ⌀ 150 mm HK000136 Supply air connection box ⌀ 125 mm with EOS / EAS HK000080 Door frame, black HK008152-01 Mounting frame, black HK008150-01 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 7: Catalytic Converter (Optional)

    This catalytic converter is suitable for all BKH units (with lifting door, with side opening door, tunnel, with cast dome, with heat exchanger cast rings and MAS). This catalytic converter can also be retrofitted. © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 8: Air Connection Box (Optional)

    *both clamp plates are supplied, but only the appropriate one is used. CAST IRON HEAT EXCHANGER RINGS (OPTIONAL) separate package (4x threaded rod, 4x hexagon nut) deflection heat exchanger ( 2x) with heat exchanger rings ( 2x) Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 9: Safety Distances Bkh Flat

    (accessories) non-combustible flooring /floor protection pane All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 10 (accessories) non-combustible flooring /floor protection pane All figures in cm When designing the exhaust system and exhaust pipe, national standards and fire protection regulations must be observed Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 11: Setting Up

    As long as the device is on the wooden pallet, it can be transported with a hand truck or forklift as usual. REMOVE THE TRANSPORT LOCKS Version with lifting door Remove the 3 transport locks ! © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 12: Set Up The Fireplace

    SET UP THE FIREPLACE Im. 1: Summarised information Version without outside air connection BHK with lifting door Workflow : Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 13: Variant With External Combustion Air Connection

    VARIANT WITH EXTERNAL COMBUSTION AIR CONNECTION Preparatory work Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 14 - using aluxflex on 3 lateral parts (S) and al- so from the bottom (B). Once you have made a decision, break out the ap- propriate part and make the connections for the air supply. Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 15: Bottom Connection (B)

    6.3.1 BOTTOM CONNECTION (B) Im. 3: Summarised information Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 16 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 17 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 18 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 19 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 20 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 21: Side Connection (S)

    6.3.2 SIDE CONNECTION (S) Im. 4: Summarised information Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 22 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 23 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 24 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 25 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 26 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 27: Variant With Eas Or Eos

    (230VAC) before starting work. Wait until the drive has been fully powered up via the battery of the control unit (max- imum running time 2 minutes). © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 28 Workflow: Make the electrical connection Variants: cable routing right side or left side Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 29 Im. 7: cable routing left side Im. 6: cable routing right side © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 30 INFO: Access Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 31 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 32 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 33 Variants cable routing - Thermocouple: right side or left side © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 34 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 35 Do not overtighten the screws! © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 36 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 37 Variant: Ther- mocouple right side Variant: Ther- mocouple left side © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 38: Fitting: Catalytic Converter

    FITTING: CATALYTIC CONVERTER Im. 8: Summarised information Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 39 2a+2b assembly tool Workflow: © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 40 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 41 START STOP © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 42: Fitting: Deflection - Combustion Chamber

    FITTING: DEFLECTION - COMBUSTION CHAMBER Summarised information: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 43 Montage Im. 9: Support points for the deflection plates © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 44 Workflow: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 45 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 46 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 47 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 48 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 49 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 50 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 51: Variants Heat Exchanger

    VARIANTS HEAT EXCHANGER CONNECTION WITH CATALYTIC CONVERTER Mounting catalytic converter: “ Fitting: catalytic converter” © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 52: Connection Without Catalytic Converter

    CONNECTION WITHOUT CATALYTIC CONVERTER Possible variants of the connection for the outlet of flue gases Position: cast iron dome - deflector plate Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 53 Examples for the position of the deflector plate - Connection variant for exhaust gases 1. Example A: with rotating cast iron dome - at rear - vertical 2. Example B: with rotating cast iron dome - at rear - horizontal © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 54 Example C: with rotating cast iron dome - left side - vertical or horizontal Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 55 Example D: with rotating cast iron dome right side vertical or horizontal © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 56 Example E: with rotating cast iron dome with heat exchanger ring - at rear - vertical or horizontal Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 57: Cast Iron Dome

    CAST IRON DOME vertical outlet horizontal outlet INFO modification: see enclosed sheet - cast iron dome Im. 10: Summarised information © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 58 Workflow: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 59: Heat Exchanger Rings

    HEAT EXCHANGER RINGS Summarised information: © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 60 Workflow: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 61 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 62 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 63 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 64 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 65 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 66 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 67 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 68 Thereafter: see “Cast iron dome” Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 69 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 70: Heat Exchanger Mas

    HEAT EXCHANGER MAS Summarised information: Workflow: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 71 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 72 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 73 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 74 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 75: Frame Variants

    FRAME VARIANTS 10.1 MOUNTING FRAME OR DOOR FRAME Mounting frame or door frame © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 76 Mounting: mounting frame Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 77 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 78 Mounting: door frame Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 79: Mounting Frame Or Door Frame (Bkh - Side With Tilting Door)

    10.2 MOUNTING FRAME OR DOOR FRAME (BKH - SIDE WITH TILTING DOOR) Summarised information: Mounting: mounting frame Mounting: door frame © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 80 Mounting frame Workflow: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 81 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 82 Door frame Workflow: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 83 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 84 Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 85: Conversions, Settings

    CONVERSIONS, SETTINGS 11.1 MODIFICATION - LIFTING DOOR: “NON SELF CLOSING” R = L R = L R = right side L = left side Im. 11: Summarised information © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 86 Workflow: Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 87 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 88: Disposal

    Do not put the glass ceramic discs in the waste glass collection container! The glass panes can be disposed of as normal household waste. Installation Manual BKH 5.0 flat 50-98 green (1.12) © 2023 Brunner GmbH...
  • Page 89 Please bring the used cacatalytic converter to a recycling center. Thank you very much for your efforts in supporting the protection of environment and sustainable use of re- sources. © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)
  • Page 90: Technical Data

    Dimension sheets - BKH flat 50-98 green lifting door Ø125/150 1000 Ø180 /200 1025 1168 1233 … mounting frame and cast iron dome Stand: 2023-09-14...
  • Page 91 Dimension sheets - BKH flat 50-98 green lifting door Ø125/150 1000 Ø180 /200 1055 1168 1233 … door frame and cast iron dome Stand: 2023-09-14...
  • Page 92 Dimension sheets - BKH flat 50-98 green lifting door Ø125/150 1000 Ø180 /200 1025 1168 1233 … mounting frame and MAS Stand: 2023-09-14...
  • Page 93 Dimension sheets - BKH flat 50-98 green lifting door Ø125/150 1000 Ø180 /200 1055 1168 1233 … door frame and MAS Stand: 2023-09-14...
  • Page 94 Dimension sheets - BKH flat 50-98 green lifting door Ø125/150 1000 Ø180 /200 Ø180 /200 1025 1168 1233 ... Mounting frame and cast iron heat exchanger rings + dome Stand: 2023-09-14...
  • Page 95 1233 ... Door frame and cast iron heat exchanger rings + dome We suggest for CAD planning Palette CAD. Permanent updated drawings: www.brunner.de Frames/ flue gas outlet connection/ combustion air supply connection/ front variants/ support bearing are marked in col-...
  • Page 96 Planning and installation - BKH flat 50-98 green lifting door Tested according to EN 13229 W EN 13229 WA Values measured at Rated power Storage operation Data for functional demonstration Rated heat power Fire wood volume kg/h Combustion performance 13.0 Flue gas mass flow 13.0 Flue gas temperature after:...
  • Page 97 All information, drawings and technical descriptions contained in this documentation are our property and may not be reproduced without prior written permission. ® BRUNNER is a registered trademark. Subject to technical changes and errors. © by Ulrich Brunner GmbH Doku-Nr.: 202851 © 2023 Brunner GmbH Installation Manual BKH 5.0 flat 50-98 green (1.12)

Table of Contents